de    |    en    |    fr    |    no

Ein Holzdach als „Reciprocal Frame“ – Die Erweiterung des Frans Masereel Centrums in Kasterlee

Louis Bergis, Klaas De Rycke, Susanne Nowak, in: Ingenieurbaukunst 2021, hrsg. von der Bundesingenieurkammer, Verlag Ernst & Sohn, Berlin

Form Follows Sun – Die Holzkuppeln des Botanischen Garten in Taiyuan

Martin Eppenschwandtner, Moritz Heimrath, Arne Hofmann, Robert Vierlinger in: Ingenieurbaukunst 2021, hrsg. von der Bundesingenieurkammer, Verlag Ernst & Sohn, Berlin

Immer wieder neu denken – Der Ingenieur und Hochschullehrer Stefan Polónyi

Klaus Bollinger, Bernhard Hauke, Harald Kloft, in: Ingenieurbaukunst 2021, hrsg. von der Bundesingenieurkammer, Verlag Ernst & Sohn, Berlin

Digitales Entwerfen – Hacking the digital Chain

Agnes Weilandt, in: Architektur fertigen – Konstruktiver Holzelementbau, hrsg. von Mario Rinke, Martin Krammer, Triest Verlag, Zürich, 2020

Beton: Material und Formgebung in der Baupraxis

Klaus Bollinger, Manfred Grohmann, in: Beton- und Stahlbetonbau, Ernst & Sohn, Berlin, 8/2020

Stefan Polónyi zum 90. Geburtstag

Klaus Bollinger, Harald Kloft, in: Beton- und Stahlbetonbau, 8/2020 und Stahlbau 8/2020, Ernst & Sohn, Berlin

Bleiben und Begegnen unter einem Dach

Standpunkt Heftpartnerin Agnes Weilandt, in: DBZ, 05/2020

Computational und Parametric Design: Chancen und Herausforderungen für die Tragwerksplanung

Annette Bögel, Klaus Bollinger, Adam Orlinski, Clemens Preisinger, Moritz Heimrath; in: Ingenieurbaukunst 2020, Verlag Ernst & Sohn, Berlin

Hoch über Wien - Die Parkapartments am Belvdere

Alexander Heise, Susanne Nowak, Daniel Pfanner, Emilio Podreka; in: Ingenieubaukunst 2020, Verlag Ernst & Sohn, Berlin

Wohnen hoch über Wien: Die Parkapartments am Belvdere

Daniel Pfanner, Susanne Nowak, Emilio Podreka; in: VDI-Bautechnik, Jahresausgabe 2019/2020

Mocape: Two institutions – one envelope – one public space

Simon Ruppert, Klaus Bollinger, Manfred Grohmann; in: Steel Construction, Verlag Ernst & Sohn, Berlin; 12,2019

ESO Supernova, Besucherzentrum und Planetarium

Adam Orlinski, Moritz Heimrath, Alexander Hofbeck, Mark Fahlbusch, in: Beton- und Stahlbetonbau, Verlag Ernst & Sohn, Berlin, 114/2019

Moderne Parametrik in der Tragwerksplanung

Clemens Preisinger, Moritz Heimrath, Adam Orlinski, Arne Hofmann, Klaus Bollinger; in: Stahlbau 88 (2019), Heft 3, Verlag Ernst & Sohn, Berlin

Hyundai Motorstudio Goyang

Moritz Heimrath, Martin Eppenschwandtner, Robert Vierlinger, Alexander Freund, Adam Orlinski, Clemens Preisinger, Arne Hofmann; in: Stahlbau 88 (2019), Heft 3, Verlag Ernst & Sohn, Berlin

Parametrische Planung kompexer Geometrie

Das neue Planetarium der europäischen Südsternwarte in München; Mark Fahlbusch, Moritz Heimrath, Adam Ordlinski, Rainer Pum; in: Ingenieurbaukunst 2018, Verlag Ernst & Sohn, Berlin

Ein Superblock mit einem Himmmel aus transluzenten Kissen

Die neue Ingenieurschule Centrale Supélec im Süden von Paris; Susanne Stacher, Etienne Antuszewicz, Klaas de Rycke, Agnes Weilandt; in: Ingenieurbaukunst 2019, Verlag Ernst & Sohn, Berlin

Kreative Ingenieukunst in Norwegens Hauptstadt

Die neue Deichmanske Bibliothek; Matthias Stracke, Knut Werner Lindeberg Alsén; in: Ingenieurbaukunst 2019, Verlag Ernst & Sohn, Berlin

Kraftwerk Lauswerk, Düsseldorf

Klaus Bollinger, Manfred Grohmann, Simon Ruppert, in: Bautechnik 95 (2018), Heft 6

ESO Supernova in Garching

Moritz Heimrath, Adam Orlinski; in: DETAIL structure, 03/18, S. 26-31

Mit Teamwork zum Kacst Headquarter

K.Bollinger, M. Grohmann, S. Ruppert, in: VDI-Bautechnik, Jahresausgabe 2017/2018, Düsseldorf, S. 84 - 90

The European Central Bank, Frankfurt, Germany

Alexander Berger, Manfred Grohmann, Klaus Bollinger, in: Cement, Special edition fib Symposium 2017, Maastricht, S. 118 - 121

Gymnasium München Nord

Beton- und Stahlbetonbau 112 (2017), Heft 6, S. 365 - 371

Rekonstruktion: Philosophicum, Frankfurt am Main

Horst Peseke, Alexander Freund, Katja Bärenfänger, Christoph Duppel; in: Bautechnik 94 (2017), Heft 1; Verlag Ernst und Sohn, Berlin

Schlank und effizient: Das Aktiv-Stadthaus in Frankfurt

K. Bollinger, M. Grohmann, Boris Mahler, Andreas Wiege, in: Ingenieurbaukunst 2017, Ernst und Sohn, Berlin 2016

Zwischen Bergstation und Almhütte: Die Dachkonstruktion des Aquamotion in Courchevel

K. Bollinger, M. Grohmann, A. Weilandt, K. De Rycke, in: Ingenieurbaukunst 2017, Ernst und Sohn, Berlin 2016

Testing Models in selected prestressed concrete structures between 1945 and 1960

Horst Peseke, Manfred Grohmann, Klaus Bollinger, IASS Symposium 2016, Spatial Structures in the 21st Century, 26.-30.09.2016, Tokyo, Japan

Digital Working

K. Bollinger, M. Grohmann, M. Heimrath, K.B. Löffler, in: Perspectives in Metropolitan Research 2 - Passion for the Built Environment, hrsg. von Annette Bögle and Chrstiane Sörensen, Jovis, Hamburg, 2016

Leistung und Ästhetik - der Weg zu innovativen Gebäudehüllen

M. Grohmann, D. Pfanner, in: Glasbau 2016, hrsg. von Bernhard Weller und Silke Tasche, Ernst und Sohn, Berlin

Flexible Strukturen mit Signalwirkung: Überdachungen für die Eingangstore der Messe Frankfurt

K. Bollinger, M. Grohmann, A. Weilandt, in: Ingenieurbaukunst 2016, Ernst & Sohn, Berlin, 2015

Authentisch und modern - Le Nouveau Carreau du Temple

K. Bollinger, C. Brensing, M. Grohmann, K. De Rycke, in: Ingenieurbaukunst 2016, Ernst & Sohn, Berlin, 2015

Ein Dach wie ein zerknittertes Stück Papier

Interview mit Klaas De Rycke, Niederlassungsleiter von Bollinger+Grohmann in Paris in: Bauwelt 42.2015, S. 22 - 23

Architektur und Tragwerk in symbiotischer Beziehung - Der Neubau der Europäischen Zentralbank in Frankfurt

K. Bollinger, C. Brensing, M. Grohmann, M. Stracke, in: Ingenieurbaukunst 2016, Ernst & Sohn, Berlin, 2015

Informationsmethodik im digitalen Planungsprozess

K. Bollinger, M. Grohmann, K.B. Löffler, in: Ernst & Sohn Special 2015: BIM - Building Information Modeling, Berlin, Nov. 2015

BIM und parametrische Planung bei Bollinger+Grohmann

Robert Uhde im Gespräch mit K.B. Löffler, A. Orlinski, M. Heimrath und T. Künzler, in: BIM - Building Information Modeling | Management, DETAIL, München, 2015

Musikkens Hus Aalborg - House of Music: Internationales Kooperationsprojekt

K. Bollinger, M. Grohmann, H. Peseke, A. Stahr: in: Beton- und Stahlbetonbau, Ernst & Sohn, Berlin, Heft 11, 2015

The Refurbishment of the Wholesale Market Hall Frankfurt

K. Bollinger, M. Grohmann, H. Peseke, IASS Symposium 2015 "Future Visions", 17 - 20 August 2015, Amsterdam, The Netherlands

Unbuildable Kiesler?!

in: "Endless Kiesler", hrsg. von Klaus Bollinger, Florian Medicus and the Austrian Frederick and Lilian Kiesler Private Foundation, Birkhäuser, 2015

Reflection about the first dome of Jena

Horst Peseke, Raül Vinyes Raso, Manfred Grohmann, Klaus Bollinger, in: IASS 2015, Future Visions, Amsterdam, Niederlande

Generative Formoptimierung zylindrisch gebogener Gläser

K. Bollinger, M. Fahlbusch, M. Grohmann, K. B. Löffler, in: Glasbau 2015, hrsg. von Bernhard Weller und Silke Tasche, Ernst und Sohn, Berlin

Was (er)trägt ein Parkhaus der 1960er und 1970er Jahre? Gedanken eines Tragwerksplaners

M. Grohman, H. Peseke, in: Mehr als nur parken. Parkhäuser weiterdenken; hrsg. von der AKH, DAM und Quantum; jovis Verlag, Berlin, 2014

Tragwerks- und Fassadenplanung aus einer Hand: King Fahad Nationalbibliothek

K. Bollinger, M. Fahlbusch, M. Grohmann, S. Nowak, in: Ingenieurbaukunst 2014; Ernst & Sohn GmbH & Co. KG, Berlin, 2014

Einfachheit und Komplexität - Louvre Lens

K. Bollinger, M. Grohmann, S. Nowak, D. Pfanner, in: Ingenieurbaukunst 2014; Ernst & Sohn GmbH & Co. KG, Berlin, 2014

Planungsprozess komplexer Strukturen

K. Bollinger, M. Grohmann, K. B. Löffler, A. Weilandt, in: Bautechnik; Ernst & Sohn GmbH & Co. KG, Berlin, 2014

Testing Models in ferroconcrete structures between 1910 and 1930

H. Peseke, K. Bollinger, M. Grohmann, in: "Shells, Membranes and Spatial Structures: Footprints", IASS 2014, Brasilien

The Großmarkthalle in Frankfurt/Main - an early reinforced concrete shell structure

H. Peseke, in: Perceived Technologies in the Modern Movement 1918 - 1975; hrsg. von do-co-mo-mo, preservation technology, Lissabon; dossier 13, 2014

Louvre Lens - Einfachheit und Komplexität

K. Bollinger, M. Grohmann, D. Pfanner, in: Glasbau 2014; hrsg. von B. Weller, S. Tasche; Ernst und Sohn Verlag, Berlin; S. 17 - 27

Parapluie - Realisierung einer ultraschlanken Betonschale durch Aktivierung einer Membrantragwirkung

K. Bollinger, M. Grohmann, S. Hauser, P. Eisenbach, R. Vasudevan, in: Beton- und Stahlbetonbau 109 (2014), Heft 1, S. 53 - 59

Kooperative Prozesse: Innovative Strukturen in und aus Österreich

K. Bollinger, A. Hofmann, S. Nowak, in: archithese 5, 2013, S. 34 - 37

Neue Überdachungen für die Eingangstore der Messe Frankfurt

A. Weilandt, I. Schrader, in: Stahlbau 82 (2013), Heft 11, S. 868 - 872

Rethinking Prototyping - Proceedings of the Design Modelling Symposium Berlin 2013

hrsg. v. C. Gengnagel, A. Kilian, J. Nembrini, F. Scheurer; Universität der Künste, Berlin, 10/2013

Sphäre Deutsche Bank, Frankfurt am Main

U. Arnold, G. Castegini, O. Drawer, M. Fahlbusch, O. Tessmann, in: Stahlbau 82 (2013), Heft 9, S. 695 - 699

Faustformel Tragwerksentwurf

hrsg. v. P Block, C. Gengnagel, S. Peters; Deutsche Verlagsanstalt, München, 9/2013

Bollinger+Grohmann

DETAIL engineering 3, hsrg. v. Christian Schittich, Peter Cachola Schmal, München, 2013

BIM in der Konstruktion

Tagungsband zum 2. Darmstädter Ingenieurkongress Bau und Umwelt (Hrsg. Uwe Rüppel), ISBN: 978-3-8440-1747-2.

Durch integrierte Planungsprozesse zu ressourceneffizienterem Bauen

K. Bollinger, L. Messari-Becker, in: BDB-Jahrbuch, hrsg.v. Bund Deutscher Baumeister, Berlin, 2013

Leichtes Tragwerk, filigrane Fassade für den Louvre-Lens

K. Bollinger, M. Grohmann, D. Pfanner, in: DETAIL Einfach und Komplex, Serie 5/2013, S. 538

Die Träger stellten eine besondere Herausforderung dar

Interview mit D. Pfanner, in Bauwelt 5/2013, S.31

Linking Structure and Parametric Geometry

C. Preisinger in: Computation Works: The Building of Algorithmic Thought, Issue 2, Wiley Verlag, 02/2013, S. 110-113

Wohnen und Arbeiten verflechten Hybrid House

Interview mit S. Ruppert, in: DBZ, Bauverlag, München, 02/2013, IBA Spezial

Instandsetzung der denkmalgeschützten Großmarkthalle, Frankfurt am Main

H. Peseke, in: Technische Akademie Esslingen: 3. Kolloquium Erhaltung von Bauwerken, 01/2013

Die Dächer des Busan Cinema Centers

K. Bollinger, B.-S. Jeon, D. Pfanner, in: Stahlbau, Ernst und Sohn Verlag, Berlin, 12/2012

Busan Cinema Center: Imageträchtige Bühne für urbanes Leben

D. Pfanner, E. Santifaller, in: Ingenieurbaukunst 2013, Junius Verlag, Hamburg, 2012

Innovation through Tradition and Technology

L. Messari-Becker, E. Santifaller, in: Arab-German Yearbook 2012, hrsg. v. Arab German Chamber of Commerce & Industry, Berlin/Doha 2012

Unbuildable Tatlin?!

hrsg. v. K. Bollinger u. F. Medicus; Springer-Verlag, Heidelberg, 2013

Atlas Moderner Stahlbau

hrsg. v. Bollinger, Grohmann, Feldmann, Giebeler, Pfanner, Zeumer; Detail Zeitschrift für Architektur + Baudetail, München, August 2011

Verdrehung und Verdichtung - Hermès Rive Gauche, Paris

K. De Rycke, A. Weilandt, in: Bauwelt 23/2011, Thema Digitales Entwerfen, S. 26-29

Innovation through Tradition and Technology

in: Energy Projects: Partnerships and Perspectives of Arab-German Cooperation, Ghorfa, 2011, S. 74-77

Design-oriented Generation of Complex Structures

K. Bollinger, A. Hofmann, C. Preisinger, in: ISEC-6 2011 Symposium Zürich, Switzerland; Modern methods and advances in structural engineering and construction

Generative Design of Adapted and Irregular Structures

K. Bollinger, A. Hofmann, C. Preisinger, in: “IABSE-IASS Symposium Taller, Longer, Lighter”, (2011), ISBN-13: 978-0-7079-7122-3; S.445

Bauen mit Beton

K. Bollinger, in: Beton- und Stahlbetonbau; Ernst&Sohn Verlag, Berlin, 2011

Erste Erfahrungen mit Mehrfamilien-Passivhäusern in monolithischer Bauweise

K. Bollinger, M. Grohmann, L. Messari-Becker, in: Bauphysik, Ernst & Sohn Verlag, Berlin; Nr. 1, Feb. 2011; S. 59-66

Hermès rive Gauche

K. Bollinger, M. Grohmann, in: adato architecture, Luxembourg, 1/11, S. 50-55

Flughafen Sheremetyevo, Moskau – Planung und Fertigung der Stahldächer und Brücke

O. Drawer, M. Fahlbusch, M. Thiel, in: Stahlbau; Ernst & Sohn Verlag, Berlin; Nr. 1381, 12/2010; S. 892

The Sphere Project - Negotiate Geometrical Representations from Design to Production

K. Bollinger, M. Grohmann, O. Tessmann, in: Advances in Architectural Geometry 2010, Springer-Verlag, 2010, S. 103-111

Digitale Prozessketten in der Umsetzung

K. Bollinger, M. Grohman, O. Tessmann, in: DETAIL Praxis Reihe: Digitale Prozesse, Nov. 2010

Das Re-Konfigurierbare Tragwerk des Smart Treefrog

K. Bollinger, M. Grohmann, S. Ruppert, in: ARCH+ 198: Haus der Zukunft, 05/10;S. 98

Das ROLEX Learning Center der EPFL in Lausanne

K. Bollinger, M. Grohmann, M. Wagner, A. Weilandt, R. Walther, G. Santini, S. von Ah, in: Beton- und Stahlbetonbau; Ernst & Sohn Verlag, Berlin; Heft 4, 2010, S. 248

Structured Becoming: Evolutionary Processes in Design Engineering

K. Bollinger, M. Grohmann, O. Tessmann, in: AD Architectural Design, Volume 80, Issue4, 2010:The New Structuralism; hrsg.von Rüdiger Karzel, S. 34

Conception of Steel Structures

in: featuring steel; Detail, Arcelor Mittal; 2009; S. 68

Shell structures of the Roleax Learning Center in Lausanne

in: Concrete Engineering International; Autumn 2009; S. 32

From conceptual design to execution, ROLEX LEARNING CENTER in Lausanne

IASS 2009, Evolution and trends in design, analysis and construction of shell and spatial structures, Valencia

Formfinding of the shells of the ROLEX LEARNING CENTER in Lausanne

IASS 2009, Evolution and trends in design, analysis and construction of shell and spatial structures, Valencia

The Großmarkthalle (wholesale market hall) in Frankfurt/Main

IASS 2009, Evolution and trends in design, analysis and construction of shell and spatial structures, Valencia

Digital methods in structural design

in: Innovative design and construction technologies; hrsg. von Ingrid Paoletti, Maggioli editore, Architettura ingegneria scienze, Mailand, 2009, S, 275

Jeder Bau ist ein Prototyp, Interview mit Klaus Bollinger und Manfred Grohmann

in: architektur. aktuell, Springer Wien, Ausgabe 349, 04/09, S. 102

Strukturoptimierung in der Baupraxis

Ruppert, S., Bollinger K., Grohmann, M., Schäfer, M.; 1. Darmstädter Ingenieurkongress - Bau und Umwelt, Technische Universität Darmstadt, 2009

Experimentalbau Großmarkthalle | The Großmarkthalle - an experimental Building

in: Martin Elsaesser und das Neue Frankfurt; hrsg. von Thomas Elsaesser, Christina Gräwe, Jörg Schilling, Peter Cachola Schmal; ernst Wasmuth Verlag, Tübingen, Berlin, 2009

Neue Techniken in der Tragwerksplanung

in: Tiefbau, BG Bau-Verlag, Heft 11/08, S. 658

Instandsetzung der denkmalgeschützten Großmarkthalle in Frankfurt am Main

in: Tiefbau, BG Bau-Verlag, Heft 10/08, S. 594

Strukturelle Vielfalt - Prozessinnovation beim Konstruieren

in: ARCH+ 188: Form Follows Performance, 07/08, S.88

Des arcs pour la structure du Learning Center

in: Tracés 12, Bulletin technique de la Suisse romande, 2 juillet 2008, S. 7

Form, Force, Performance: Multi-Parametric Structural Design

in: AD Architectural Design, Volume 78, Issue 2. Special Issue: Versatillity and Vicissitude; hrsg. von Michael Hensel und Achim Menges, S. 20

Craft and advanced architecture

in: Virtual Futures for Design, Construction & Procurement; hrsg. von Peter Brandon und Tuba Kocatürk, Wiley-Blackwell, London, 04/08

Standpunkt I, Prof. Dipl.-Ing. Manfred Grohmann zum Thema "Architektur und Tragwerk"

in: DBZ, 3/2008, S. 34

Methoden und Werkzeuge der digitalen Tragwerksplanung

in: DETAIL, 12/07, S. 1484

Standseilbahn-Stationen in Innsbruck

in: DETAIL, 12/07, S. 1458

Architekt und Bauingenieur im Gespräch: Auf gute Zusammenarbeit (Interview Klaus Bollinger und Helge Bofinger)

in: Talis, Architekten und Bauingenieure, jam Verlag, Offenbach, 2007, S.58

Bitterfelder Bogen

in: Stahlbau, 08/2006, S. 683

Bitterfelder Bogen - Eine neue Landmarke für die Region Bitterfeld-Wolfen in Sachsen-Anhalt

in: adato, 4/06, S. 56

Die integrierte Planung der Zollverein School of Management and Design

in: DETAIL, 12/2005, S. 1466

Realizing new geometries for European Museums

in: Proceedings of 3rd International Conference on Innovation in Architecture, Engineering and Construction. Rotterdam: 2005, S. 129

Digital Workflow - Building Computer Generated Designs

in: Proceedings of 3rd International Conference on Innovation in Architecture, Engineering and Construction. Rotterdam: 2005, S. 117

Tragkonstruktion der BMW-Welt in München

in: Stahlbau 07/2005, S. 483

Reinforced concrete shells without formwork - a new approach to the construction of RC shells

J. Kollegger, R. Nemes, C. Preisinger, A. Kratochvill, H. Torghele; Publishing Company of Budapest University of Technology and Economics, Volume 1 (2005), ISBN: 963420838x; 217 - 222.

Ideen für den Reisswolf

in: Beziehungen ? Relationships. Schneider + Schumacher Architektur. Hamburg: Junius-Verlag, 2005, S. 72

Optimierung von Tragwerken

Vertieferarbeit Nr. 12/2005, Institut für Massivbau, Technische Universität Darmstadt

Entwicklung eines optimierten Dachtragwerkes für eine Schwimmhalle

Diplomarbeit Nr. 14/2005, Institut für Massivbau, Technische Universität Darmstadt

Assessment of Concrete Structures Using Nonlinear Finite Element Analysis

J. KOLLEGGER, C. PREISINGER; Talk: IABSE Symposium Shanghai 2004, Shanghai; 09-22-2004 – 09-24-2004; in: "Metropolitan Habitats and Infrastructure", (2004), ISBN: 3-85748-110-2; 362 - 363.

Kooperatives Planen

in: Baumeister 5/04, S. 94

Kunsthaus Graz - Design and Construction

in: Proceedings of the IASS Symposium Shell and Spatial Structures - From Model to Realization. Montpellier, France: 2004, S. 346

Spatial Structures for Fair Events

in: Proceedings of the IASS Symposium Shell and Spatial Structures - From Model to Realization. Montpelier, France: 2004, S. 456

Von Euklid zu Bezier ? Geometrie und Tragstruktur

in: Adato, 01/04, S 36

Stahlbau - Konstruktionsübung, Entwurf und Berechung einer Tonnenschale mit vorgespannter Seilfassade

in Zusammenarbeit mit Rädel, P.; Konstruktiver Entwurf, Institut für Stahlbau, Technische Universität Darmstadt, 2004

Workflow Struktur - Architektur, Klaus Bollinger + Manfred Grohmann

Basel: Birkhäuser, 2004

Die Tragkonstruktion der Gebäude für die Neue Messe in Karlsruhe

Mit Trautz, M., Bautechnik 80/2003, Heft 11, S. 757

Nonlinear design procedures for reinforced concrete plates and shells

C. PREISINGER, R. POPOV, J. KOLLEGGER; Talk: EURO-C 2003 Conference on Computational Modelling of Concrete Structures, St. Johann im Pongau, Österreich; ISBN: 90-5809-536-3; 777 - 782.

Tragwerke von Hochhäusern

in: Eisele, Johann (Hrsg.); Kloft, Ellen (Hrsg.): Hochhausatlas. München: Callway Verlag, 2002, S. 96

Optimization of Reinforcement in Concrete Plat and Shell Structures with the Aid of Non-linear Finite Element Analysis

C. Preisinger, R. Popov, J. Kollegger; Talk: 5th World Conference on Computational Mechanics, Vienna; 07-07-2002 - 07-12-2002; in: "Book of Abstracts-Fifth World Congress on Computational Mechanics", Volume I (2002), 283.

Zur Degradation von Stahlbetonbauteilen unter Ermüdungsbeanspruchung

Dissertation, Ruhr-Universität Bochum

Reliability of reinforced concrete structures under fatigue

Reliability Engineering. & System Safety 77(3): pp. 253-261.

Formunvollendet

Mit Trautz, M., db 11/01, S. 105

Freie Formen in tragfähige Gebäude verwandeln

in: Gernot Brauer (Hrst.): Dynaform, Architektur als Markenkommunikation. Basel: Birkhäuser, 2001, S. 184

Seebrücke und Pegelturm Goitzsche

in: Bautechnik 04/2001, S. 256

Nordpolbrücke Bochum

in: Stahlbau, 4/2001, S. 258

Tragwerksplanung im Digitalen Workflow

in: Peter Cachola Schmal (Hrsg.): digitalreal, BLOBMEISTER: erste gebaute Projekte. Basel: Birkhäuser, 2001

Auch ein Rohbau muss schön sein

in: db 12/1999, S.104

Berechnung rotationssymmetrisch beanspruchter Stahlbetonplatten mit Ringbewehrung

in: Bauwerksplanung, Verlag Rudolf Müller, 1990

Bewehren nach neuer Stahlbetonkonzeption, II. Tragverhalten von rotations-symmetrisch beanspruchten Stahlbetonplatten

mit Polony, S., Block, K., Bautechnik 11/1985, S. 378

Bewehren nach neuer Stahlbetonkonzeption, I. Der Balken, die Kreisplatte, die innere Steifigkeit

mit Polony, S., Block, K., Bautechnik 12/1984, S. 422

Ansätze in der Konzeption des Stahlbetons

mit Polony, S., Die Bautechnik 60, 1983, Heft 4, S. 109

Zur Berechnung regelmäßig gelochter Scheiben und Platten

mit Schardt, R., Bauingenieur 56, 1981, S. 227

Brandsicherheit von Stahlbetonkragstützen

in: Tagungsband des 6. Gießener Bauforums 2009 in Gießen; hrsg. von Shaker Verlag, Aachen 2009

Testing Models in ferroconcrete structures between 1910 and 1930

P. Eisenbach, R. Vasudevan, M. Grohmann, K. Bollinger, S. Hauser, in: Journal of the international association for shell and spatial sstructures, Vol 55 (2014), No. 4

GPD Glass Performance Days 2015, Viscoelastic Properties of Laminated Glass Interlayers – Theory and Experiments, Technische Universität Darmstadt

Kuntsche, Johannes / Schuster, Miriam / Schneider, Jens / Langer, Sabrina

Rethink! Prototyping, Transdisciplinary Concepts of Prototyping

Gengnagel C., Nagy E., Stark R., Springer 2016, 240 pages

Natural-fibre-reinforced plastics in actively bent structures, Proceedings of the ICE - Construction Materials

Gengnagel C.; Lafuente Hernández E; Bäumer R., Volume 166, Issue 6, pages 365 –377, Thomas Telford Ltd 2013

Special issue on actively bent structures, International Journal of Space Structures

Gengnagel (Guest Editor), Volume 28, Number 3 - 4 / September-December 2013, Multi Science Publishing, pages 119-240

Computational Design Modeling: Proceedings of the Design Modeling

Gengnagel C.(Editor), Kilian A (Editor), Palz N.(Editor), Scheurer F.(Editor), Symposium Berlin 2011, Springer; 2012 edition, 348 pages

02 June - 02 July 2021

Queens of Structure

PROJECTS AND POSITIONS OF FEMALE CIVIL ENGINEERS
As part of the "Women in Architecture WIA2021" festival in Berlin, 12 female civil engineers of various nationalities are also demonstrating their creativity and competence in the exhibition "Queens of Structure". The exhibition not only offers insights into exciting projects but also focuses on the topic of diversity and civil engineering against the background of the primary perceived performance of architects.
Included is a portrait and project presentation of our colleague Agnes Weilandt, partner at B+G.

02 June - 02 July 2021, Technical University Berlin

1 June 2021

'Fluid Bodies'

3 years ago, Bollinger+Grohmann joined the artistic research project ‘Fluid Bodies’ under the direction of Klaus Bollinger at the University of Applied Arts Vienna. The research project aimed to challenge the conventional formwork concepts about concrete and the pre-existing assumptions about the material and its abilities. Models and objects in various sizes where produced with a series of methods spanning over many disciplines such as architecture, fashion design, structural design and sculpture.

To celebrate the end of the project, the research team opens the doors to the public for a one-day exhibition at the Wotruba-Atelier in Vienna where they completed their last workshop.

1 June 2021, 16:00
Rustenschacherallee 2-4
1020 Vienna

21 May 2021

First Prize: Reinventing Cities Milan

We are happy about the first place in the competition MoLeCoLa promoted by Comune di Milano and C40 Cities, Reinventing Cities.

This impressive result was possible thanks to the multidisciplinarity and integrated design and the collaborative work between all team members under the leadership of Park Associati and Hines Italy: Habitech - Distretto Tecnologico Trentino, ESA | engineering, consultancy & sustainability, BollingerGrohmann, MIC - Mobility In Chain, Baggio Marilena Greencure, Irs - Istituto per la Ricerca Sociale, Schneider Electric, A2A CALORE & SERVIZI S.R.L., Wood Beton S.p.a., Ammlex - Amministrativisti Associati.

Photo: Park Associati

April 2021

ERFURT - BUGA 2021

The Bundesgartenschau in Erfurt has opened end of April and the panorama lift with the 27m long, very light and narrow connecting walkways is in operation. The walkways connect the free-standing elevator tower with the mighty bastion wall. On the city side, the small platform at the elevator tower offers a great view towards the cathedral square and the historic centre.

Architecture: Schulitz Architects
Structural Engineering: Bollinger+Grohmann

Photo: Schulitz Architects

April 2021

SOMNIUM featured in "Stahlbau"

As part of the extension of the Johannes Kepler Universität in Linz, we were in charge of the structural engineering of the SOMNIUM, a free-form platform on the highest building on the campus. The viewing terrace, which is spatially framed by a trellis for future vegetation, serves as a remote oasis of relaxation for campus visitors.

Now the project is featured in the April issue of "Stahlbau" by Ernst und Sohn, Berlin. The authors are Thomas Schaumberger and Arne Hofmann from Bollinger+Grohmann Vienna.

27 April 2021

Competitionline Ranking 2020

The competitionline-Ranking is the only architects' ranking in the German-speaking world that is based exclusively on competition results. Once a year, the competitionline editorial team evaluates all the competition results published on competitionline.com and creates the ranking of the most successful offices from them.

We are very pleased about the good rankings of our office in the following categories:

3rd place in the category STRUCTURAL ENGINEERS
6th place in the category CIVIL ENGINEERS
3rd place in the category BUILDING PHYSICS

April 2021

2nd place in competition: NICE HQ, Oderzo

"Nice Headquarter" is designed as a high-tech building. The key characteristics are the transparency and lightness of the façades and the roof, which is a monolithic element that opens and closes according to the sun position and weather conditions. It provides a dynamic and flexible space for the inner courtyard.

A set of integrated lights enhances the building's perception at night, maintaining a high level of visibility and a sober profile blending with the surrounding environment.

Bollinger+Grohmann was responsible for structural and façade engineering.

©Photo: Park Associati and Bollinger+Grohmann

12. April 2021

Stefan Polónyi (1930–2021)

We received the sad news that Stefan Polónyi has passed away on April 9.

Stefan Polónyi was a leading builder, master teacher, inventor, pioneer and role model. His exemplary contribution in science, teaching and practice strengthened the self-image of engineers and consistently enhanced constructive interaction between architects and engineers. We will miss him. Our thoughts are with his family.

Photo: Benedikt Kraft

1 April 2021

Green & Blue Building Award

The Ilse Wallentin-Haus is the recent timber construction at the University of Natural Resources and Life Sciences, Vienna (BOKU). The project received the Green & Blue Building-Award in the category “Project” for the focus on sustainability during the development as well as for the use of recyclable & renewable materials.

Client: BIG Bundesimmobiliengesellschaft m.b.H.
Architect: SWAP Architekten, Delta Projektconsult
Structural Engineer: Bollinger+Grohmann

Congratulations to the entire project team!

30 March 2021

International Competition in Sicily: Finalist

Our project was one of the 5 finalists in the International Competition for the new Administrative Centre of the Sicilian Region. It was great to participate in such a challenging and innovative project! Congratulations to the whole team:

Studio Transit, Studio Valle Progettazioni, Studio Faraone, Studio Cangemi, United Consulting, Bollinger+Grohmann, Gae Engineering, Studio A&P architettura del paesaggio with Eleonora Tomassini, Vamirgeoind, Fabio Roncato


Image: HERE S.r.l. with ENGRAM

March 2021

Riedbergallee Student Residence: Process

The timber structure of the 5-story student residence (timber and concrete hybrid) is rising in high speed. The prefabricated CLT wall and slab elements, which span up to approx. 8 m, arrive with all necessary openings and milled slots for the service pipes and are mounted next to the buildings concrete cores and compartment walls. Together with Ferdinand Heide Architects from Frankfurt we started planning in early 2018 and were responsible for the structural engineering (LP1 to LP6) and building physics (LP1 to LP7).

Photo: Kai Laumann

February 2021

AIT Award Finalist 2020

The AIT awards are one of the largest competitions for architecture and interior design in the world. The Frankfurt Pavilion by schneider+schumacher and Bollinger+Grohmann was among the finalists in the category Retail/Fair.

The iconic building was constructed for the first time at the Frankfurt Book Fair in 2018 and returned again as the venue for events with authors and industry experts from all over the world in 2019. The space-defining structure was generated and optimized by the team, taking into account architectural, structural and static criteria using genetic algorithms.

15 February 2021

"WOOD. Change the present. Build the future."

After one year of research on timber structures, Bollinger+Grohmann and Park Associati are working on a publication to collect all the information. How did we get the results of our research on wood? We combined our expertise through the applied exercise of re-engineering.

February 2021

Fritz-Kissel-Siedlung, Frankfurt: Process

The speedy construction process in Frankfurt's Fritz-Kissel-Siedlung is impressive. After the building permit was granted in September 2020, the first tenants moved into the apartments in mid-December.

Since several construction steps happen at the same time, you can follow every timber module addition phase on the construction site.

Bollinger+Grohmann was already in charge of the feasibility study for fire protection and the structural design for the extension in 2017. We are now responsible for the entire fire protection concept and the structural engineering for the existing structures.

January 2021

Second Annual USGlass Design Awards: Recognition for MoMA NY

We are happy to share that our project "Extension of The Museum of Modern Art", has been recognized in the Second Annual USGlass Design Awards, winning in the low- to mid-rise construction category.

As part of the façade team with FRENER & REIFER , Bollinger+Grohmann were responsible for the structural analysis, building physics proofs, design-assist, construction document phase, workshop and assembly planning of the façade.

January 2021

Digital Media House of the "Rundfunk Berlin-Brandenburg"

After Baumschlager Eberle Architekten won the Berlin-Brandenburg Broadcasting rbb "Digital Media House and Campus Development" project in summer 2020, Bollinger+Grohmann were chosen as planners for structural engineering, façade engineering and building physics.

The new building will combine cross-media working and production processes, moreover intensify the cooperation of radio, online and television.

Visualization: rbb/Baumschlager Eberle Architekten

21 January 2021

Architizer A+Firm Awards 2021: Distinction

The A+Firm Awards spotlight engineers and professionals from the AEC sector.
We are very pleased that Bollinger+Grohmann has been selected as one of the five Finalists in the Best Engineering Firm category!

December 2020

FOUR Frankfurt: Construction progress

After the start of the special foundation civil engineering in 2019, FOUR, our large-scale construction site has reached the foundation pit in partial cover construction. The reinforcement of the first-floor slab section has been laid and from now on it will go up parallel to the basement levels with the high-rise buildings.
Together with our ARGE partner Werner Sobek Frankfurt, we congratulate all those involved in the project on reaching this milestone.

15 January 2021

Opening Tondo in Brussels

On Thursday 14 January 2021, the footbridge Tondo officially opened in Brussels.

Designed by Office KGDVS, the "spatial element" connects the House of Representatives’ offices with its recent extensions, the new Forum Building, on the other side of the Leuvensestraat. It can be described as a stiff disc, the roof, on which the floor hangs with a minimal presence of structure.

Bollinger+Grohmann has been responsible for the structural engineering.

14 January 2021

B+G Brussels has just moved!

New year, new office, same nice team now in Rue de la Loi, Wetstraat 26, 1040 Brussels.

We look forward to meeting you there very soon!

14 January 2021, 4 pm - 5 pm

BAU Online 2021: Book presentation "Nachhaltigkeit, Ressourceneffizienz und Klimaschutz“

In March, the new handbook "Sustainability, Resource Efficiency and Climate Protection" is going to be published by Ernst & Sohn. The aim is to summarise the current state of the art for civil engineers and the construction industry with constructive solutions for planning and building and to provide assistance and orientation.

December 2020

"Architektur fertigen. Konstruktiver Holzelementbau."

The new Triest Verlag publication has been available in bookshops for two weeks. The book focuses on design and planning strategies with regard to their professional practice.

In her contribution about "Digital Design - Hacking the digital chain", our colleague Agnes Weilandt introduces the method of parametric design and uses several project examples to show how the design can emerge in a system of synchronous design, technical feasibility and production.

24 December 2020

Thank you for your trust and best wishes for 2021!

The team of Bollinger+Grohmann is on holidays. Our branches are closed during the following period:

Frankfurt: 24 Dec 2020 – 1 Jan 2021
Berlin: 22 Dec 2020 – 1 Jan 2021
Munich: 24 Dec 2020 – 1 Jan 2021
Stuttgart: 23 Dec 2020 – 10 Jan 2021
Vienna: 24 Dec 2020 – 1 Jan 2021
Budapest: 21 Dec 2020 – 1 Jan 2021
Oslo: 23 Dec 2020 – 1 Jan 2021
Melbourne: 24 Dec - 15 Jan 2021

We are looking forward to new cooperations in 2021.

Picture: M. Süß

December 2020

Project office in Milan

Bollinger+Grohmann has a second location in Italy with a project office in Milan from January 2021. The key contact is Tommaso Pagnacco. As branch manager, he will be working in close cooperation with Stefano Cammareri as managing director of Bollinger+Grohmann Ingegneria S.r.l.

We are already engaged with well-known Milanese architects on challenging projects, in the field of research and development and on competitions as well. We are now looking forward to new and exciting opportunities.

Image: Alberto Feltrin

24. November 2020

2nd Annual Symposium Ingenieurbaukunst – Design for Construction

On 24 November 2020, the 2nd Symposium called Ingenieurbaukunst - Design for Construction takes place and the motto is "Climate protection, resource efficiency and what's next?".

Christoph Gengnagel (Bollinger+Grohmann | UDK Berlin) participates together with Uwe Heiland, SEH Engineering at 14:30 in the panel discussion "The increase of high tech is low-tech".

The entire event will be broadcasted online from the Berlin-Brandenburg Academy of Sciences and Humanities.

24 November 2020

The Interdisciplinary Academic Center of the Digital Cultures in Nantes won the Equerre d'Argent in the "Activities" category.

Architects: LIN en collaboration avec F.au

November 2020

Daniel Pfanner in DBZ podcast and November issue

The DBZ team discusses within the DBZ podcast relevant questions about architecture, construction technology and building practice. Daniel Pfanner talks in the DBZ podcast and the November issue about "the ideal façade" in the course of the expert talk by the "NEXT Expertenforum" alongside with Rudi Scheuermann, Director and Global Leader Building Envelope Design from Arup and Benedikt Kraft, deputy editor-in-chief of DBZ in the Next Studio in Frankfurt.

Picture ©Benedikt Kraft / DBZ

October 2020

Deichman Library wins Norwegian concrete award

The Norwegian award "Betongtavlen" is given to buildings in which concrete is used in an ecologically, aesthetically and technically outstanding way.
The library was designed by the architects Lund Hagem Arkitekter and AtelierOslo. Bollinger+Grohmann is responsible for structural engineering.

©Picture Einar Aslaksen / Pudder Agency

10 November 2020

Emporis Skyscraper Award

This is the twentieth time that the Emporis High-Rise Award. The 164 m high Leeza SOHO Tower in Beijing takes 2nd place and Frankfurt's Omniturm is in 9th place and is 190 m high.

We are happy to have been involved in the planning of these exceptional buildings. Congratulations to the design teams led by Zaha Hadid Arch. and BIG for these awards.

15 October 2020

Idea Conference 2020

Due to Corona, this year's "Idea Conference - From Ideas to Realization" will also take place in digital format only.

Adam Orlinski, B+G Vienna, will give his lecture from 11:15 - 12:00:
"Parametric Engineering - Strategies for Combining Algorithmic Modelling and Structural Design".

08 October 2020

2020 ConstruirAcier Trophées Eiffel: Awarded

The Lycée Léonard de Vinci in Saint-Germain-en-Laye, France, has won the 2020 ConstruirAcier Trophée Eiffel. Congratulations to TANK Architectes and COSA - Colboc Sachet architectures!

Bollinger+Grohmann was responsible for the structural design.

© TANK et COSA, architectes associés, Photo : Camille Gharbi

September 2020

First game at Allegiant Stadium in Las Vegas

Las Vegas Raiders hosted their first game at Allegiant Stadium in Las Vegas. The opening match in the newly built 1.8bn mega stadium took place on September 21st.

Bollinger+Grohmann provided the design of the cable roof structure and did the studies for the complex Biglift-installation and prestressing procedure of the cable roof. We were present on-site from the very beginning until the last cable was pinned.

01 October 2020

Construction progress in Luxemburg

The construction work on the new European Commission building complex in Luxembourg is progressing. The construction of the new building complex includes two phases. First, the 180-meter-long 7-storey main building will be built. In the second phase, the 90-meter high office tower is to be built. Both buildings should be completed by the beginning of 2024. The Bâtiment Jean Monnet II was designed by KSP - Jürgen Engel Architekten. Bollinger+Grohmann are responsible for structural and façade engineering.

22 September 2020

Kneipp Erlebnispark - Olsberg bridge

The 34-metre long bridge at the western turning point of the Kneipp Active Circuit in Olsberg was lifted in September and is now close to completion.

Bollinger+Grohmann are responsible for object planning and structural engineering.

24 Semptember 2020

Topping-out ceremony: Training Center Bonn

After a construction period of only 10 months, the topping-out ceremony for the new medical training center was celebrated at the Bonn University Clinic.
After completion, the four-story reinforced concrete building will provide space for over 600 trainees.

B+G was responsible for the structural engineering.

23 September 2020

"2 of 5": The International Highrise Award 2020

B+G was responsible for the structural concept of two finalists 2020: "Leeza Soho" in Peking and "Omniturm" in Frankfurt - where we were also in charge of the façade design (concept- and schematic design, design development). Congratulations to our clients Soho and Tishman Speyer and the design teams led by Zaha Hadid Arch. and BIG.

The International Highrise Award has been awarded by the city of Frankfurt am Main since 2003.

20 September 2020, from 4 p.m.

Next Expertenforum: Die adaptive Gebäudehülle

Together with the DBZ as a media partner, Wicona and the NEXT Partners invite all interested and curious parties to the virtual NEXT expert forum on 22 September 2020.

4:30 p.m.:
"Fluid Flow Glazing: eine Glasfassade für die Zukunft?", lecture of Daniel Pfanner, partner/management, Bollinger+Grohmann

22 September 2020

Autodesk BIM Modeling Guideline

The new and first edition of the German AUTODESK BIM MODELING GUIDELINE was released yesterday. It contains a lot of useful tips provided by the main author Markus Hiermer and expert insights by our friends and project partners HL-Technik, Kohlbecker, VRAME and many others. Our colleagues Florian Gschwind and Alexander Hofbeck from B+G Munich and Frankfurt were also involved and contributed with their knowledge and project experience, such as how to set-up a BIM-Workflow in a collaborative environment with Architects and MEP-Planners or how to create proper BIM-Models.

16 September 2020

Out now: Ingenieurbaukunst - Engineering made in Germany

The book presents 20 outstanding buildings out of five volumes of the book "Ingenieurbaukunst", published by the Federal Chamber of Engineers.

We are very happy to be part of this volume featuring two of our projects, the Louvre in Lens and the new ECB premises, which even made it onto the cover.

05 September - 22 November 2020

"urbainable - stadthaltig"

Positions on the European City for the 21st Century
Exhibition by the Akademie der Künste.

34 members of the Architecture Section present a broad spectrum of ideas for the city of the future along with the pressing issues of our time, such as digitalisation, mobility, cultural techniques of density, handling with nature, building in existing structures or technical innovations.

Duration of the exhibition: 5.9. - 22.11.2020
Venue: Academy of Arts, Hanseatenweg 10, 10557 Berlin

Picture © Erik-Jan Ouwerkerk. Graphic: Heimann + Schwantes

05 September 2020, 4 pm

The Watson's Hotel (2019, India, 82 min.)

The film by Ragunath Vasudevan, Nathanie Knop and Peter Rippel will be shown in full length on the opening weekend to complement the exhibition contribution of Klaus Bollinger and Ragunath Vasudevan.

25 August 2020

Interchange Pavillon, South Eveleigh, Sydney

The newly opened Interchange Pavilion located in the Australian Technology Park consists of 15 tonnes of robotically moulded glass-reinforced concrete, 1400 pieces of router cut hardwood and 250 metres of stainless steel ground rails. The unique material palette is supported by a 14-tonne structure made up of 1650 digitally fabricated aluminium pieces to form a 350 m² public art installation. Bollinger+Grohmann was responsible for structural engineering.
Photo: Studio Chris Fox
Isomoetry: Bollinger+Grohmann

May 2020

B+G in Düsseldorf

Since the end of May we are now also represented in the Rhineland with our new branch in Düsseldorf.
The address is:
B+G Bollinger and Grohmann GmbH
Zollhof 6 / Grand Bateau
40221 Düsseldorf
Due to current situation, the planned opening ceremony of the office has unfortunately been delayed until after Corona.
If you are in the region, you are welcome to drop by for a visit.
We are looking forward to new exciting projects!

26 June 2020

Won: Extension Sportforum Hohenschönhausen, Berlin

B+G won the competition for the extension of the top sports training centre for winter sports called Sportforum in the general planning team with Nieto Sobejano Arquitectos, Berlin and Madrid.
The new building will be directly connected to the existing speed skating hall and will provide spaces for further training facilities for the athletic training of the ice sportsmen as well as a functional area with offices, sanitary facilities, changing rooms and lounges.
Visualisation: Nieto Sobejano

18 June 2020

Opening of the Deichman Library in Oslo

After the delay caused by Corona, the opening of the new Deichman Library will finally take place on the 18th of June. The official opening ceremony can be followed live on Facebook at 5:00 pm.
B+G was responsible for the structural and façade design of this exciting project.
Photo: Einar Aslaksen

16 July 2020

Opening of the Climate house in Oslo

The Climate House in Oslo, designed by the architects Lund Hagem and Atelier Oslo, was opened on 16.06.2020 in the presence of Prince Haakon. Bollinger+Grohmann was responsible for the structural design, sustainability and project management from the competition to the permit planning. Congratulations to all who were involved in that successful and sustainable building.

11 June 2020

WON: Overlook for Sivlefossen in Nærøydalen, Voss, Norway

We won together with the architects from Østengen & Bergo the competition for the new spectacular overlook "Sivlefossen". We were one of three offices invited to take part in the competition for a new overlook for Sivlefossen in Nærøydalen, Voss.
Visualisation: Østengen & Bergo

9 June 2020

WON: Competition "Opptre" in Oslo

As part of the research project “Opptre”, we won together with mopo architects and the local builder Tømrermester Torstein Newth (both from Oslo) the competition for a rehab-project of a typical Norwegian timber house from the 50s. Our design topped on energy savings (83% reduction) and nZEB-balance (Energy standard for nearly Zero Energy Buildings) as well as architecture.

27 May 2020

Winning competition - Arena Porte de la Chapelle

We are happy to announce that we won the competition of the "Arena" for the Olympics and Paralympics 2024 in Paris together with Ville de Paris and Bouygues Bâtiment Île-de-France and the architect offices SCAU and NP2F.
The 8000-seat venue and the two superimposed timber gymnasiums will host the Badminton and Taekwondo competitions. Afterwards, Basketball games and music shows will be hosted in the arena.
Bollinger+Grohmann supported the team with structural and façade engineering.
Image credit: ArtefactoryLab

14 May 2020

Quartiersporthaus Wilhelmsburg, Hamburg: 1st prize for ROBERTNEUN

Congratulations to the architects from ROBERTNEUN on winning 1st prize in the urban planning and building construction competition for the
"Quartiersporthaus Wilhelmsburg" in Hamburg.
The "Quartierssporthaus" forms the centre of the newly developing Elbe island quarter located in Hamburg Wilhelmsburg. In future, the new building will be the sporting home of the Bundesliga basketball club Hamburg Towers. In addition, a triple sports hall, a sports hostel, a hotel and an office building are planned.
B+G consulted the competition team in terms of structural engineering.
Visualisation: ROBERTNEUN

May 2020

"Bleiben und Begegnen unter einem Dach"

As Deutsche Bauzeitschrift magazine partner, Agnes Weilandt comments on spectacular structures, digital planning processes and the limits of feasibility in the current issue about roof structures and in the DBZ podcast.
There is also a report on the roof construction of the Frans Masreel Centre in Kasterlee, Belgium. B+G was responsible for the structural engineering.

20 March 2020

WINNING COMPETITION - Didier Vaillant sports complex, Villiers-le-Bel, France

We are very happy to announce that we won the design competition for the construction of the project Didier Vaillant sports complex with the architects from bureau faceB and Ylé Architectes.
The sports equipment project engages in current problems by structural optimization to reduce useful material with timber lattice beams, the choice of local materials and low carbon emissions.
Bollinger+Grohmann supported the team with a structural engineering consultancy.
Image credit : Edouard Maréchal - Paris Picture Club

13 March 2020

WINNING COMPETITION - Gymnasium and multi-purpose hall, Presles-en-Brie, France

We are very happy to announce that we won the design competition together with the architects Lemoal Lemoal for the construction of a gymnasium and a multi-purpose hall, held by the city of the Presles-en-Brie. This project proposes material optimization, the choice of local materials and low carbon emissions with the use of timber lattice beams. Bollinger+Grohmann supported the team with structural and façade engineering consultancy.
Image credit: Jeudi Wang

February 2020

Article by Stefan Polóny: DBZ 02/2020

Reading tip by Stefan Polóny in the DBZ (Deutsche Bauzeitschrift) issue 02/2020.
Foto: Benedikt Kraft / DBZ

13 January 2020

WON: Competition for the new office tower in Düsseldorf at Kennedydamm 55

Congratulations to kadawittfeldarchitektur, who has won the competition for the new office tower in Düsseldorf at Kennedydamm 55.
The twisted tower will contain approx. 26000m² and reach a height of 120m.
The client is AENGEVELT Immobilien from Düsseldorf. We supported the team with structural and façade engineering consultancy.

December 2019

3 x CTBUH Award of Excellence Winner 2020

The Omniturm was the only European high-rise building to receive the Award of Excellence in the category "Best Tall Building 100 - 199 meters", alongside five other high-rise buildings from Asia, Australia and North America.
The Leeza SOHO Tower was also awarded in the category "Best Tall Building 200-299 meters".
The LAKTHA CENTER is listed in the category "Best Tall Building 400 meters and above".
We are delighted to have been part of the planning of these extraordinary buildings and congratulate all those who were involved in its construction.

1 January 2020

Bollinger+Grohmann is growing

As of January 1st, 2020, Bollinger+Grohmann will also be represented in Budapest and Brussels.
Managing director and administrator in Budapest is Csaba Böhm.
Address:
Bollinger + Grohmann Engineers Kft.,
Kossuth Lajos utca 4. 3rd floor 3B,
1053 Budapest, Hungary.
Managing director and administrators are Wim Jansen, Kenny Verbeek and Klaas de Rycke.
Address:
Bollinger Grohmann S.r.l.,
Boulevard de l'Empereur 24,
1000 Bruxelles, Belgium.