de    |    en    |    fr    |    no

Computational und Parametric Design: Chancen und Herausforderungen für die Tragwerksplanung

Annette Bögel, Klaus Bollinger, Adam Orlinski, Clemens Preisinger, Moritz Heimrath; in: Ingenieurbaukunst 2020, Verlag Ernst & Sohn, Berlin

Hoch über Wien - Die Parkapartments am Belvdere

Alexander Heise, Susanne Nowak, Daniel Pfanner, Emilio Podreka; in: Ingenieubaukunst 2020, Verlag Ernst & Sohn, Berlin

Wohnen hoch über Wien: Die Parkapartments am Belvdere

Daniel Pfanner, Susanne Nowak, Emilio Podreka; in: VDI-Bautechnik, Jahresausgabe 2019/2020

Mocape: Two institutions – one envelope – one public space

Simon Ruppert, Klaus Bollinger, Manfred Grohmann; in: Steel Construction, Verlag Ernst & Sohn, Berlin; 12,2019

ESO Supernova, Besucherzentrum und Planetarium

Adam Orlinski, Moritz Heimrath, Alexander Hofbeck, Mark Fahlbusch, in: Beton- und Stahlbetonbau, Verlag Ernst & Sohn, Berlin, 114/2019

Moderne Parametrik in der Tragwerksplanung

Clemens Preisinger, Moritz Heimrath, Adam Orlinski, Arne Hofmann, Klaus Bollinger; in: Stahlbau 88 (2019), Heft 3, Verlag Ernst & Sohn, Berlin

Hyundai Motorstudio Goyang

Moritz Heimrath, Martin Eppenschwandtner, Robert Vierlinger, Alexander Freund, Adam Orlinski, Clemens Preisinger, Arne Hofmann; in: Stahlbau 88 (2019), Heft 3, Verlag Ernst & Sohn, Berlin

Parametrische Planung kompexer Geometrie

Das neue Planetarium der europäischen Südsternwarte in München; Mark Fahlbusch, Moritz Heimrath, Adam Ordlinski, Rainer Pum; in: Ingenieurbaukunst 2018, Verlag Ernst & Sohn, Berlin

Ein Superblock mit einem Himmmel aus transluzenten Kissen

Die neue Ingenieurschule Centrale Supélec im Süden von Paris; Susanne Stacher, Etienne Antuszewicz, Klaas de Rycke, Agnes Weilandt; in: Ingenieurbaukunst 2019, Verlag Ernst & Sohn, Berlin

Kreative Ingenieukunst in Norwegens Hauptstadt

Die neue Deichmanske Bibliothek; Matthias Stracke, Knut Werner Lindeberg Alsén; in: Ingenieurbaukunst 2019, Verlag Ernst & Sohn, Berlin

Kraftwerk Lauswerk, Düsseldorf

Klaus Bollinger, Manfred Grohmann, Simon Ruppert, in: Bautechnik 95 (2018), Heft 6

ESO Supernova in Garching

Moritz Heimrath, Adam Orlinski; in: DETAIL structure, 03/18, S. 26-31

Mit Teamwork zum Kacst Headquarter

K.Bollinger, M. Grohmann, S. Ruppert, in: VDI-Bautechnik, Jahresausgabe 2017/2018, Düsseldorf, S. 84 - 90

The European Central Bank, Frankfurt, Germany

Alexander Berger, Manfred Grohmann, Klaus Bollinger, in: Cement, Special edition fib Symposium 2017, Maastricht, S. 118 - 121

Gymnasium München Nord

Beton- und Stahlbetonbau 112 (2017), Heft 6, S. 365 - 371

Rekonstruktion: Philosophicum, Frankfurt am Main

Horst Peseke, Alexander Freund, Katja Bärenfänger, Christoph Duppel; in: Bautechnik 94 (2017), Heft 1; Verlag Ernst und Sohn, Berlin

Schlank und effizient: Das Aktiv-Stadthaus in Frankfurt

K. Bollinger, M. Grohmann, Boris Mahler, Andreas Wiege, in: Ingenieurbaukunst 2017, Ernst und Sohn, Berlin 2016

Zwischen Bergstation und Almhütte: Die Dachkonstruktion des Aquamotion in Courchevel

K. Bollinger, M. Grohmann, A. Weilandt, K. De Rycke, in: Ingenieurbaukunst 2017, Ernst und Sohn, Berlin 2016

Testing Models in selected prestressed concrete structures between 1945 and 1960

Horst Peseke, Manfred Grohmann, Klaus Bollinger, IASS Symposium 2016, Spatial Structures in the 21st Century, 26.-30.09.2016, Tokyo, Japan

Digital Working

K. Bollinger, M. Grohmann, M. Heimrath, K.B. Löffler, in: Perspectives in Metropolitan Research 2 - Passion for the Built Environment, hrsg. von Annette Bögle and Chrstiane Sörensen, Jovis, Hamburg, 2016

Leistung und Ästhetik - der Weg zu innovativen Gebäudehüllen

M. Grohmann, D. Pfanner, in: Glasbau 2016, hrsg. von Bernhard Weller und Silke Tasche, Ernst und Sohn, Berlin

Flexible Strukturen mit Signalwirkung: Überdachungen für die Eingangstore der Messe Frankfurt

K. Bollinger, M. Grohmann, A. Weilandt, in: Ingenieurbaukunst 2016, Ernst & Sohn, Berlin, 2015

Authentisch und modern - Le Nouveau Carreau du Temple

K. Bollinger, C. Brensing, M. Grohmann, K. De Rycke, in: Ingenieurbaukunst 2016, Ernst & Sohn, Berlin, 2015

Ein Dach wie ein zerknittertes Stück Papier

Interview mit Klaas De Rycke, Niederlassungsleiter von Bollinger + Grohmann in Paris in: Bauwelt 42.2015, S. 22 - 23

Architektur und Tragwerk in symbiotischer Beziehung - Der Neubau der Europäischen Zentralbank in Frankfurt

K. Bollinger, C. Brensing, M. Grohmann, M. Stracke, in: Ingenieurbaukunst 2016, Ernst & Sohn, Berlin, 2015

Informationsmethodik im digitalen Planungsprozess

K. Bollinger, M. Grohmann, K.B. Löffler, in: Ernst & Sohn Special 2015: BIM - Building Information Modeling, Berlin, Nov. 2015

BIM und parametrische Planung bei Bollinger + Grohmann

Robert Uhde im Gespräch mit K.B. Löffler, A. Orlinski, M. Heimrath und T. Künzler, in: BIM - Building Information Modeling | Management, DETAIL, München, 2015

Musikkens Hus Aalborg - House of Music: Internationales Kooperationsprojekt

K. Bollinger, M. Grohmann, H. Peseke, A. Stahr: in: Beton- und Stahlbetonbau, Ernst & Sohn, Berlin, Heft 11, 2015

The Refurbishment of the Wholesale Market Hall Frankfurt

K. Bollinger, M. Grohmann, H. Peseke, IASS Symposium 2015 "Future Visions", 17 - 20 August 2015, Amsterdam, The Netherlands

Unbuildable Kiesler?!

in: "Endless Kiesler", hrsg. von Klaus Bollinger, Florian Medicus and the Austrian Frederick and Lilian Kiesler Private Foundation, Birkhäuser, 2015

Reflection about the first dome of Jena

Horst Peseke, Raül Vinyes Raso, Manfred Grohmann, Klaus Bollinger, in: IASS 2015, Future Visions, Amsterdam, Niederlande

Generative Formoptimierung zylindrisch gebogener Gläser

K. Bollinger, M. Fahlbusch, M. Grohmann, K. B. Löffler, in: Glasbau 2015, hrsg. von Bernhard Weller und Silke Tasche, Ernst und Sohn, Berlin

Was (er)trägt ein Parkhaus der 1960er und 1970er Jahre? Gedanken eines Tragwerksplaners

M. Grohman, H. Peseke, in: Mehr als nur parken. Parkhäuser weiterdenken; hrsg. von der AKH, DAM und Quantum; jovis Verlag, Berlin, 2014

Tragwerks- und Fassadenplanung aus einer Hand: King Fahad Nationalbibliothek

K. Bollinger, M. Fahlbusch, M. Grohmann, S. Nowak, in: Ingenieurbaukunst 2014; Ernst & Sohn GmbH & Co. KG, Berlin, 2014

Einfachheit und Komplexität - Louvre Lens

K. Bollinger, M. Grohmann, S. Nowak, D. Pfanner, in: Ingenieurbaukunst 2014; Ernst & Sohn GmbH & Co. KG, Berlin, 2014

Planungsprozess komplexer Strukturen

K. Bollinger, M. Grohmann, K. B. Löffler, A. Weilandt, in: Bautechnik; Ernst & Sohn GmbH & Co. KG, Berlin, 2014

Testing Models in ferroconcrete structures between 1910 and 1930

H. Peseke, K. Bollinger, M. Grohmann, in: "Shells, Membranes and Spatial Structures: Footprints", IASS 2014, Brasilien

The Großmarkthalle in Frankfurt/Main - an early reinforced concrete shell structure

H. Peseke, in: Perceived Technologies in the Modern Movement 1918 - 1975; hrsg. von do-co-mo-mo, preservation technology, Lissabon; dossier 13, 2014

Louvre Lens - Einfachheit und Komplexität

K. Bollinger, M. Grohmann, D. Pfanner, in: Glasbau 2014; hrsg. von B. Weller, S. Tasche; Ernst und Sohn Verlag, Berlin; S. 17 - 27

Parapluie - Realisierung einer ultraschlanken Betonschale durch Aktivierung einer Membrantragwirkung

K. Bollinger, M. Grohmann, S. Hauser, P. Eisenbach, R. Vasudevan, in: Beton- und Stahlbetonbau 109 (2014), Heft 1, S. 53 - 59

Kooperative Prozesse: Innovative Strukturen in und aus Österreich

K. Bollinger, A. Hofmann, S. Nowak, in: archithese 5, 2013, S. 34 - 37

Neue Überdachungen für die Eingangstore der Messe Frankfurt

A. Weilandt, I. Schrader, in: Stahlbau 82 (2013), Heft 11, S. 868 - 872

Rethinking Prototyping - Proceedings of the Design Modelling Symposium Berlin 2013

hrsg. v. C. Gengnagel, A. Kilian, J. Nembrini, F. Scheurer; Universität der Künste, Berlin, 10/2013

Sphäre Deutsche Bank, Frankfurt am Main

U. Arnold, G. Castegini, O. Drawer, M. Fahlbusch, O. Tessmann, in: Stahlbau 82 (2013), Heft 9, S. 695 - 699

Faustformel Tragwerksentwurf

hrsg. v. P Block, C. Gengnagel, S. Peters; Deutsche Verlagsanstalt, München, 9/2013

Bollinger + Grohmann

DETAIL engineering 3, hsrg. v. Christian Schittich, Peter Cachola Schmal, München, 2013

BIM in der Konstruktion

Tagungsband zum 2. Darmstädter Ingenieurkongress Bau und Umwelt (Hrsg. Uwe Rüppel), ISBN: 978-3-8440-1747-2.

Durch integrierte Planungsprozesse zu ressourceneffizienterem Bauen

K. Bollinger, L. Messari-Becker, in: BDB-Jahrbuch, hrsg.v. Bund Deutscher Baumeister, Berlin, 2013

Leichtes Tragwerk, filigrane Fassade für den Louvre-Lens

K. Bollinger, M. Grohmann, D. Pfanner, in: DETAIL Einfach und Komplex, Serie 5/2013, S. 538

Die Träger stellten eine besondere Herausforderung dar

Interview mit D. Pfanner, in Bauwelt 5/2013, S.31

Linking Structure and Parametric Geometry

C. Preisinger in: Computation Works: The Building of Algorithmic Thought, Issue 2, Wiley Verlag, 02/2013, S. 110-113

Wohnen und Arbeiten verflechten Hybrid House

Interview mit S. Ruppert, in: DBZ, Bauverlag, München, 02/2013, IBA Spezial

Instandsetzung der denkmalgeschützten Großmarkthalle, Frankfurt am Main

H. Peseke, in: Technische Akademie Esslingen: 3. Kolloquium Erhaltung von Bauwerken, 01/2013

Die Dächer des Busan Cinema Centers

K. Bollinger, B.-S. Jeon, D. Pfanner, in: Stahlbau, Ernst und Sohn Verlag, Berlin, 12/2012

Busan Cinema Center: Imageträchtige Bühne für urbanes Leben

D. Pfanner, E. Santifaller, in: Ingenieurbaukunst 2013, Junius Verlag, Hamburg, 2012

Innovation through Tradition and Technology

L. Messari-Becker, E. Santifaller, in: Arab-German Yearbook 2012, hrsg. v. Arab German Chamber of Commerce & Industry, Berlin/Doha 2012

Unbuildable Tatlin?!

hrsg. v. K. Bollinger u. F. Medicus; Springer-Verlag, Heidelberg, 2013

Atlas Moderner Stahlbau

hrsg. v. Bollinger, Grohmann, Feldmann, Giebeler, Pfanner, Zeumer; Detail Zeitschrift für Architektur + Baudetail, München, August 2011

Verdrehung und Verdichtung - Hermès Rive Gauche, Paris

K. De Rycke, A. Weilandt, in: Bauwelt 23/2011, Thema Digitales Entwerfen, S. 26-29

Innovation through Tradition and Technology

in: Energy Projects: Partnerships and Perspectives of Arab-German Cooperation, Ghorfa, 2011, S. 74-77

Design-oriented Generation of Complex Structures

K. Bollinger, A. Hofmann, C. Preisinger, in: ISEC-6 2011 Symposium Zürich, Switzerland; Modern methods and advances in structural engineering and construction

Generative Design of Adapted and Irregular Structures

K. Bollinger, A. Hofmann, C. Preisinger, in: “IABSE-IASS Symposium Taller, Longer, Lighter”, (2011), ISBN-13: 978-0-7079-7122-3; S.445

Bauen mit Beton

K. Bollinger, in: Beton- und Stahlbetonbau; Ernst&Sohn Verlag, Berlin, 2011

Erste Erfahrungen mit Mehrfamilien-Passivhäusern in monolithischer Bauweise

K. Bollinger, M. Grohmann, L. Messari-Becker, in: Bauphysik, Ernst & Sohn Verlag, Berlin; Nr. 1, Feb. 2011; S. 59-66

Hermès rive Gauche

K. Bollinger, M. Grohmann, in: adato architecture, Luxembourg, 1/11, S. 50-55

Flughafen Sheremetyevo, Moskau – Planung und Fertigung der Stahldächer und Brücke

O. Drawer, M. Fahlbusch, M. Thiel, in: Stahlbau; Ernst & Sohn Verlag, Berlin; Nr. 1381, 12/2010; S. 892

The Sphere Project - Negotiate Geometrical Representations from Design to Production

K. Bollinger, M. Grohmann, O. Tessmann, in: Advances in Architectural Geometry 2010, Springer-Verlag, 2010, S. 103-111

Digitale Prozessketten in der Umsetzung

K. Bollinger, M. Grohman, O. Tessmann, in: DETAIL Praxis Reihe: Digitale Prozesse, Nov. 2010

Das Re-Konfigurierbare Tragwerk des Smart Treefrog

K. Bollinger, M. Grohmann, S. Ruppert, in: ARCH+ 198: Haus der Zukunft, 05/10;S. 98

Das ROLEX Learning Center der EPFL in Lausanne

K. Bollinger, M. Grohmann, M. Wagner, A. Weilandt, R. Walther, G. Santini, S. von Ah, in: Beton- und Stahlbetonbau; Ernst & Sohn Verlag, Berlin; Heft 4, 2010, S. 248

Structured Becoming: Evolutionary Processes in Design Engineering

K. Bollinger, M. Grohmann, O. Tessmann, in: AD Architectural Design, Volume 80, Issue4, 2010:The New Structuralism; hrsg.von Rüdiger Karzel, S. 34

Conception of Steel Structures

in: featuring steel; Detail, Arcelor Mittal; 2009; S. 68

Shell structures of the Roleax Learning Center in Lausanne

in: Concrete Engineering International; Autumn 2009; S. 32

From conceptual design to execution, ROLEX LEARNING CENTER in Lausanne

IASS 2009, Evolution and trends in design, analysis and construction of shell and spatial structures, Valencia

Formfinding of the shells of the ROLEX LEARNING CENTER in Lausanne

IASS 2009, Evolution and trends in design, analysis and construction of shell and spatial structures, Valencia

The Großmarkthalle (wholesale market hall) in Frankfurt/Main

IASS 2009, Evolution and trends in design, analysis and construction of shell and spatial structures, Valencia

Digital methods in structural design

in: Innovative design and construction technologies; hrsg. von Ingrid Paoletti, Maggioli editore, Architettura ingegneria scienze, Mailand, 2009, S, 275

Jeder Bau ist ein Prototyp, Interview mit Klaus Bollinger und Manfred Grohmann

in: architektur. aktuell, Springer Wien, Ausgabe 349, 04/09, S. 102

Strukturoptimierung in der Baupraxis

Ruppert, S., Bollinger K., Grohmann, M., Schäfer, M.; 1. Darmstädter Ingenieurkongress - Bau und Umwelt, Technische Universität Darmstadt, 2009

Experimentalbau Großmarkthalle | The Großmarkthalle - an experimental Building

in: Martin Elsaesser und das Neue Frankfurt; hrsg. von Thomas Elsaesser, Christina Gräwe, Jörg Schilling, Peter Cachola Schmal; ernst Wasmuth Verlag, Tübingen, Berlin, 2009

Neue Techniken in der Tragwerksplanung

in: Tiefbau, BG Bau-Verlag, Heft 11/08, S. 658

Instandsetzung der denkmalgeschützten Großmarkthalle in Frankfurt am Main

in: Tiefbau, BG Bau-Verlag, Heft 10/08, S. 594

Strukturelle Vielfalt - Prozessinnovation beim Konstruieren

in: ARCH+ 188: Form Follows Performance, 07/08, S.88

Des arcs pour la structure du Learning Center

in: Tracés 12, Bulletin technique de la Suisse romande, 2 juillet 2008, S. 7

Form, Force, Performance: Multi-Parametric Structural Design

in: AD Architectural Design, Volume 78, Issue 2. Special Issue: Versatillity and Vicissitude; hrsg. von Michael Hensel und Achim Menges, S. 20

Craft and advanced architecture

in: Virtual Futures for Design, Construction & Procurement; hrsg. von Peter Brandon und Tuba Kocatürk, Wiley-Blackwell, London, 04/08

Standpunkt I, Prof. Dipl.-Ing. Manfred Grohmann zum Thema "Architektur und Tragwerk"

in: DBZ, 3/2008, S. 34

Methoden und Werkzeuge der digitalen Tragwerksplanung

in: DETAIL, 12/07, S. 1484

Standseilbahn-Stationen in Innsbruck

in: DETAIL, 12/07, S. 1458

Architekt und Bauingenieur im Gespräch: Auf gute Zusammenarbeit (Interview Klaus Bollinger und Helge Bofinger)

in: Talis, Architekten und Bauingenieure, jam Verlag, Offenbach, 2007, S.58

Bitterfelder Bogen

in: Stahlbau, 08/2006, S. 683

Bitterfelder Bogen - Eine neue Landmarke für die Region Bitterfeld-Wolfen in Sachsen-Anhalt

in: adato, 4/06, S. 56

Die integrierte Planung der Zollverein School of Management and Design

in: DETAIL, 12/2005, S. 1466

Realizing new geometries for European Museums

in: Proceedings of 3rd International Conference on Innovation in Architecture, Engineering and Construction. Rotterdam: 2005, S. 129

Digital Workflow - Building Computer Generated Designs

in: Proceedings of 3rd International Conference on Innovation in Architecture, Engineering and Construction. Rotterdam: 2005, S. 117

Tragkonstruktion der BMW-Welt in München

in: Stahlbau 07/2005, S. 483

Reinforced concrete shells without formwork - a new approach to the construction of RC shells

J. Kollegger, R. Nemes, C. Preisinger, A. Kratochvill, H. Torghele; Publishing Company of Budapest University of Technology and Economics, Volume 1 (2005), ISBN: 963420838x; 217 - 222.

Ideen für den Reisswolf

in: Beziehungen ? Relationships. Schneider + Schumacher Architektur. Hamburg: Junius-Verlag, 2005, S. 72

Optimierung von Tragwerken

Vertieferarbeit Nr. 12/2005, Institut für Massivbau, Technische Universität Darmstadt

Entwicklung eines optimierten Dachtragwerkes für eine Schwimmhalle

Diplomarbeit Nr. 14/2005, Institut für Massivbau, Technische Universität Darmstadt

Assessment of Concrete Structures Using Nonlinear Finite Element Analysis

J. KOLLEGGER, C. PREISINGER; Talk: IABSE Symposium Shanghai 2004, Shanghai; 09-22-2004 – 09-24-2004; in: "Metropolitan Habitats and Infrastructure", (2004), ISBN: 3-85748-110-2; 362 - 363.

Kooperatives Planen

in: Baumeister 5/04, S. 94

Kunsthaus Graz - Design and Construction

in: Proceedings of the IASS Symposium Shell and Spatial Structures - From Model to Realization. Montpellier, France: 2004, S. 346

Spatial Structures for Fair Events

in: Proceedings of the IASS Symposium Shell and Spatial Structures - From Model to Realization. Montpelier, France: 2004, S. 456

Von Euklid zu Bezier ? Geometrie und Tragstruktur

in: Adato, 01/04, S 36

Stahlbau - Konstruktionsübung, Entwurf und Berechung einer Tonnenschale mit vorgespannter Seilfassade

in Zusammenarbeit mit Rädel, P.; Konstruktiver Entwurf, Institut für Stahlbau, Technische Universität Darmstadt, 2004

Workflow Struktur - Architektur, Klaus Bollinger + Manfred Grohmann

Basel: Birkhäuser, 2004

Die Tragkonstruktion der Gebäude für die Neue Messe in Karlsruhe

Mit Trautz, M., Bautechnik 80/2003, Heft 11, S. 757

Nonlinear design procedures for reinforced concrete plates and shells

C. PREISINGER, R. POPOV, J. KOLLEGGER; Talk: EURO-C 2003 Conference on Computational Modelling of Concrete Structures, St. Johann im Pongau, Österreich; ISBN: 90-5809-536-3; 777 - 782.

Tragwerke von Hochhäusern

in: Eisele, Johann (Hrsg.); Kloft, Ellen (Hrsg.): Hochhausatlas. München: Callway Verlag, 2002, S. 96

Optimization of Reinforcement in Concrete Plat and Shell Structures with the Aid of Non-linear Finite Element Analysis

C. Preisinger, R. Popov, J. Kollegger; Talk: 5th World Conference on Computational Mechanics, Vienna; 07-07-2002 - 07-12-2002; in: "Book of Abstracts-Fifth World Congress on Computational Mechanics", Volume I (2002), 283.

Zur Degradation von Stahlbetonbauteilen unter Ermüdungsbeanspruchung

Dissertation, Ruhr-Universität Bochum

Reliability of reinforced concrete structures under fatigue

Reliability Engineering. & System Safety 77(3): pp. 253-261.

Formunvollendet

Mit Trautz, M., db 11/01, S. 105

Freie Formen in tragfähige Gebäude verwandeln

in: Gernot Brauer (Hrst.): Dynaform, Architektur als Markenkommunikation. Basel: Birkhäuser, 2001, S. 184

Seebrücke und Pegelturm Goitzsche

in: Bautechnik 04/2001, S. 256

Nordpolbrücke Bochum

in: Stahlbau, 4/2001, S. 258

Tragwerksplanung im Digitalen Workflow

in: Peter Cachola Schmal (Hrsg.): digitalreal, BLOBMEISTER: erste gebaute Projekte. Basel: Birkhäuser, 2001

Auch ein Rohbau muss schön sein

in: db 12/1999, S.104

Berechnung rotationssymmetrisch beanspruchter Stahlbetonplatten mit Ringbewehrung

in: Bauwerksplanung, Verlag Rudolf Müller, 1990

Bewehren nach neuer Stahlbetonkonzeption, II. Tragverhalten von rotations-symmetrisch beanspruchten Stahlbetonplatten

mit Polony, S., Block, K., Bautechnik 11/1985, S. 378

Bewehren nach neuer Stahlbetonkonzeption, I. Der Balken, die Kreisplatte, die innere Steifigkeit

mit Polony, S., Block, K., Bautechnik 12/1984, S. 422

Ansätze in der Konzeption des Stahlbetons

mit Polony, S., Die Bautechnik 60, 1983, Heft 4, S. 109

Zur Berechnung regelmäßig gelochter Scheiben und Platten

mit Schardt, R., Bauingenieur 56, 1981, S. 227

Brandsicherheit von Stahlbetonkragstützen

in: Tagungsband des 6. Gießener Bauforums 2009 in Gießen; hrsg. von Shaker Verlag, Aachen 2009

Testing Models in ferroconcrete structures between 1910 and 1930

P. Eisenbach, R. Vasudevan, M. Grohmann, K. Bollinger, S. Hauser, in: Journal of the international association for shell and spatial sstructures, Vol 55 (2014), No. 4

GPD Glass Performance Days 2015, Viscoelastic Properties of Laminated Glass Interlayers – Theory and Experiments, Technische Universität Darmstadt

Kuntsche, Johannes / Schuster, Miriam / Schneider, Jens / Langer, Sabrina

Rethink! Prototyping, Transdisciplinary Concepts of Prototyping

Gengnagel C., Nagy E., Stark R., Springer 2016, 240 pages

Natural-fibre-reinforced plastics in actively bent structures, Proceedings of the ICE - Construction Materials

Gengnagel C.; Lafuente Hernández E; Bäumer R., Volume 166, Issue 6, pages 365 –377, Thomas Telford Ltd 2013

Special issue on actively bent structures, International Journal of Space Structures

Gengnagel (Guest Editor), Volume 28, Number 3 - 4 / September-December 2013, Multi Science Publishing, pages 119-240

Computational Design Modeling: Proceedings of the Design Modeling

Gengnagel C.(Editor), Kilian A (Editor), Palz N.(Editor), Scheurer F.(Editor), Symposium Berlin 2011, Springer; 2012 edition, 348 pages

26 - 27 March 2020

„Glas als unendlich reflektierendes Objekt"

This year, the conference Glasbau 2020 will take place from 26 to 27.03.2020 as an online conference.

On 26 March at 10 am, Klaas De Rycke will give a lecture on our facade project MORLAND MIXITÉ CAPITALE.

13 March 2020

From the idea to the skyscraper

Lecture by Simon Ruppert at the theme day "High Rise City Frankfurt", which is part of the TALK programme of this year's Luminale in Frankfurt.

- - - EVENT IS CANCELLED - - -





Rendering: UN Studio @ Groß & Partner

12. februar 2020

Pre-opening of the Deichman Library in Oslo

We are very happy about the completion of the new Deichman library in the old harbour area of Oslo. On the occasion of a pre-opening, the building was opened to the first guests.

B+G was responsible for the structural and façade design of this exciting project.

The official opening is postponed until further notice.

February 2020

Article by Stefan Polóny: DBZ 02/2020

Reading tip by Stefan Polóny in the DBZ (Deutsche Bauzeitschrift) issue 02/2020.

Foto: Benedikt Kraft / DBZ

13 January 2020

WON: Competition for the new office tower in Düsseldorf at Kennedydamm 55

Congratulations to kadawittfeldarchitektur, who has won the competition for the new office tower in Düsseldorf at Kennedydamm 55.
The twisted tower will contain approx. 26000m² and reach a height of 120m.
The client is AENGEVELT Immobilien from Düsseldorf. We supported the team with structural and façade engineering consultancy.

December 2019

3 x CTBUH Award of Excellence Winner 2020

The Omniturm was the only European high-rise building to receive the Award of Excellence in the category "Best Tall Building 100 - 199 meters", alongside five other high-rise buildings from Asia, Australia and North America.

The Leeza SOHO Tower was also awarded in the category "Best Tall Building 200-299 meters".

The LAKTHA CENTER is listed in the category "Best Tall Building 400 meters and above".

We are delighted to have been part of the planning of these extraordinary buildings and congratulate all those who were involved in its construction.

1 January 2020

Bollinger + Grohmann Ingenieure is growing

As of January 1st, 2020, Bollinger + Grohmann will also be represented in Budapest and Brussels.

Managing director and administrator in Budapest is Csaba Böhm.
Address: Bollinger + Grohmann Engineers Kft.,
Kossuth Lajos utca 4. 3rd floor 3B,
1053 Budapest, Hungary.

Managing director and administrators are Wim Jansen, Kenny Verbeek and Klaas de Rycke.
Address:
Bollinger Grohmann S.r.l.,
Boulevard de l'Empereur 24,
1000 Bruxelles, Belgium.

19 December 2019

Winning Competition - Atlantic Hotel Erfurt, Germany

Congratulations to Delugan Meissl Associated Architects on their winning entry for the Atlantic Hotel Erfurt competition. We supported Delugan Meissl with structural engineering consultancy.

Rendering: Delugan Meissl Associated Architects

12 December 2019

Luxembourg Architecture Award 2019

The Luxembourg Learning Center - Maison du Livre located in Esch-Belval (Valentiny hvp architects) has won the 8th Luxembourg Architecture Award in the category "the Audience Award".

12 December 2019

Winning competition project - Footbridge "Tor-que"

We are very happy to announce that the project “Tor-que” is the winner of the competition held by the city of Reutlingen, Germany. The project consists of replacing the old footbridge by a new arched footbridge in the centre city spanning 40m.

Architect: Explorations Architecture, Paris, France
Landscape architect: Ana Marti Baron
Image credit: Luxigon

4 December 2019

"Architecture et marges, le Low-tech dans tous ses états"

Klaas De Rycke participates in the round table « Vers une ‘’basse technologie’’ des modes de représentation et de conception ? » as part of the symposium "Architecture et marges, le Low-tech dans tous ses états" organized by the group "Ressources".

The Symposium will be held at ENSACF Clermont-Ferrand
Time: 9am to 6pm

22 November 2019

Topping out ceremony of the fire and rescue station, Igstadt, Germany

On November 22nd, the topping-out ceremony of the new fire station III in Wiesbaden took place. The reinforced concrete shell located in the outskirts of Igstadt was erected in approx. 8 months.
Bollinger + Grohmann Ingenieure are responsible for structural engineering.

Bauzeichner/in oder Architekt/in mit Revit-Kenntnissen

Zur Verstärkung unseres Konstruktionsteams in Frankfurt suchen wir möglichst kurzfristig

eine/n qualifizierte/n Bauzeichner/in (Schwerpunkt Ingenieurbau oder Architektur)

oder

eine/n Architekten/in (Schwerpunkt Objektplanung Ausführungsplanung)

9 November 2019

Inauguration of the two-story sports hall in Frankfurt

After only two years of construction, the two-story sports hall with two three-field sports halls on top of each other were handed over to the Landessportbund Hessen in Frankfurt last weekend.

B+G were responsible for the structural engineering, the foundation sheeting and the thermal building physics planning.

7 November 2019

AMO 2019 Award: Two Awards

We are happy to announce that two of our projects are among the winners of the AMO 2019 Award.

PRIX DU LIEU LE MIEUX PRODUCTIF: Frans Masereel Centrum
Client: Frans Masereel Centrum (BE) / Architects: LIST, Hideyuki Nakayama Architecture

PRIX DU MEILLEUR CATALYSEUR URBAIN: Alvéole 12
Client: City of Saint Nazaire, Sonadev / Architects: 51N4E, Bourbouze & Graindorge

The buildings were awarded among 170 competing projects by a jury chaired by Enrique Sobejano.

November 2019

Winning Competition - "Lot Petit", Paris, France

We are very happy to announce that we have won "lot Petit" on the former site of the Saint-Vincent de Paul hospital in the heart of Paris together with architects Kuehn Malvezzi, Nicolas Dorval-Bory and Plan Comun.

The project consists in 13 500m² of housing, 10 floors in wooden structure and a massive stone façade Passivhause level building, part of the "triple zero" approach, zero carbon, zero emissions, zero waste. It is a pilot project for the Paris City Hall.

B+G supported the team with structural and façade engineering consultancy.

Visualistion: pagesdepuispetit

31 October 2019

Award for the secondary school in Berlin Mahlsdorf

The Integrated Secondary School is one of the winners of the 2019 Berlin Timber Construction Award in the "New Construction" category.
The initiators of this award want to support the increasing number of constructive timber buildings in Berlin concerning ecological and sustainable buildings and promote innovative construction methods.

Architects: NKBAK, Frankfurt, Germany
Structural engineering: Bollinger + Grohmann Ingenieure, Frankfurt, Berlin, Germany

22 November 2019

Computational and Parametric Design

"Opportunities and challenges for structural engineering"
Lecture by Klaus Bollinger and Annette Bögle (HCU) Hamburg on the occasion of the "Ingenieurbaukust | Design for Construction 2020" symposium.

Venue: abk Weißenhof-Campus (New building 2)
Time: 13 o'clock

22 October 2019

"Construction Acier 2019" for the project "University library Belval" in Luxemburg

We are delighted to be awarded the prestigious steel construction prize of the Belgian steel construction association "Infosteel" for the university library in Esch-Belval. This year, the conversion of the Möllerhalle, a listed building, into a library with a museum character was awarded both the Jury Prize and the Audience Prize.

Architects: Valentiny hvp architects, Remerschen, Luxembourg
Structural engineering: Bollinger + Grohmann Ingenieure

19 October 2019

Obituary

We mourn the loss of our good friend and colleague

Hendrik Laing

He worked with us from the beginning.
Without him, we would not be where we are today. We owe him a lot.

Our sympathy goes to his family,
especially to his wife Antje Laing and his children Nele and Sören.

Klaus Bollinger, Manfred Grohmann,
The management team and all colleagues.

October 2019

"Parkapartments am Belvedere" in the DBZ journal

The October issue of the "Deutsche Bauzeitschrift" (DBZ) focuses on structural engineering. Buildings were deliberately selected for this purpose that see the supporting structure as a central design element and thus make it a very special architectural statement.

15 October 2019

Return of the Frankfurt Pavilion

The temporary structure was realized in collaboration with schneider + schumacher architekten. The iconic building was constructed for the first time on the Frankfurt Book Fair in 2018 and is also this year's venue for events with authors and industry experts from all over the world.
The space-defining construction was generated and optimized using genetic algorithms taking into account architectural and structural criteria.

07 October 2019

Torroja Medal for Manfred Grohmann

After his plenary lecture at the IASS Symposium 2019 "Form and Force", Manfred Grohmann received the "Torroja Medal", which was awarded to him this year.

26 September 2019

Opening: University of Graz Library

The University of Graz celebrated the opening after the extension and renovation of the campus library. A new reading hall cantilevers 20m above the original 1890s building.
Bollinger + Grohmann was responsible for structural engineering.

September 2019

Completion: Temporary modular Kindergarden in Jardins du Luxembourg, Paris

The temporary kindergarten designed by Djuric Tardio Architectes in Jardin du Luxembourg has just been completed. Located in the 6th arrondissement of Paris, this modular timber structure is fully demountable and reconfigurable.
B+G Paris was in charge of the structural design.

26 September 2019

Fotografihuset på Sukkerbiten

I konkurranse med 97 andre bidrag vant Atelier Oslo den internasjonale arkitektkonkurransen om utforming av Fotografihuset på Sukkerbiten i Oslo.
Bollinger+Grohmann var ansvarlig for konstruksjonsteknikk.

Illustrasjon: Atelier Oslo

19 September 2019

How to become an apprentice in 10 minutes - 10 minutes to find an apprenticeship

This year, Bollinger + Grohmann takes part for the first time in the Apprentice-Speed-Dating at the IHK in Frankfurt. The event offers people who are searching for an apprenticeship and companies the opportunity to find suitable apprentice positions or suitable applicants in 10 minutes.

Venue: Industrie- und Handelskammer, Börsenplatz 4, Frankfurt
Time: 10 am - 3 pm

7 - 10 October 2019

Plenary Lecture by Manfred Grohmann: Architecture und Structure

This year the joint international conference "IASS Symposium 2019" and the "Structural Membranes 2019" under the title "Form and Force" will take place from 7 to 10 October in Barcelona.

21 - 25 September 2019

Design modelling Symposium Berlin 2019

By synthesizing artistic, theoretical and technological perspectives and positions, the Design Modelling Symposium will provide a platform for key research questions about the role of the digital age in relation to art, architecture and design, and the impact on the future of society, environment and innovation.

14 September - 06 October 2019

Stadtlabor Friederike

The experimental structure FRIEDERIKE is presented as of the City of Vienna's cultural initiative to showcase art in an public space. Performances, concerts, film showings will be held under the temporary structure which runs from 14.09.2019 until 6.10.2019 in the 14th district of Vienna. Bollinger + Grohmann gave expert advice on the structural design.

12 September 2019

Omniturm. Work Life United

At the 14th Jung architecture talks, Manfred Grohmann (B+G), Kai-Uwe Bermann (BIG) and Florian Reiff (Tishman Speyer) used the example of the Omniturm project to discuss what the combination of working and living means for architecture and interdisciplinary planning.

The event was held in the crowded Frankfurt Jugend- und Kulturkirche Sankt Peter in Frankfurt.

© JUNG.DE / Fotograf: Markus Eichelmann

11 September 2019

Tragwerksentwurf und -modellierung am Beispiel des Hochhauskomplexes FOUR, Frankfurt

Lecture by Simon Ruppert in the course of the seminar "Weiterbildung für Tragwerksplaner 2019: FE-Berechnung und Modellierung" at the TU Darmstadt.

Venue: TUD, Institut für Massivbau, Gebäude L3/01 Raum 93
Time: 16.45 - 17.15 Uhr

18 September 2019

SO FOUR SO GOOD Zum Tragwerksentwurf des ersten Hochhausclusters Deutschlands

The second lecture by Simon Ruppert within the seminar "Weiterbildung für Tragwerksplaner 2019: FE-Berechnung und Modellierung", this time at the TU Kaiserslautern.

Venue: TU Kaiserslautern, Gebäude 46, Raum 210
Time: 4.45 - 5.15 pm

08 September 2019

Opening: Bauhaus Museum Dessau

The opening of the Museum in Dessau is one of the highlights of the annyversary year of Bauhaus. For the first time the Bauhaus Dessau Foundation’s unique collection will be comprehensively displayed.
Bollinger + Grohmann was in charge of the structural and façade engineering, the fire protection planning as well as for the building physics.

06 - 07 September 2019

Bollinger + Grohmann future workshop in Antwerp

On 06 and 07 Semptember, the team of the entire Bollinger + Grohmann Group came together to a workshop in Antwerp to discuss about roots, philosophy and future of our company.

September 2019

Connect 3/19: Norge forfølger målene sine konsekvent

Michael Lommertz, faglig leder bærekraft B+G Oslo, snakker om bærekraft i Norge i et intervju med det norsk-tyske handelskammerets magasin «connect». (32-37)

13 September 2019, 12 am - 2 pm

Just a simple engineering love affair. Workflow / Digital Fabrication

On September, 13th, Klaas de Rycke (B+G Paris) will give a lecture at SCAU architecture in Paris.

Information and registration: communication@scau.com

29 August 2019

Lunch lecture at Gewers Pudewill

Daniel Pfanner (B+G) visited the colleagues of Gewers Pudewill end of August for a lunch lecture about the challenging façade engineering of the project Louvre in Lens, France.

Picture: Philipp Winter

6 August 2019

Opening of the new school and gymnasium in Berlin Mahlsdorf

The new school for 550 pupils was completed on time at the beginning of the new school year, along with the gymnasium. The school is the first of three model projects that the Berlin Senate has commissioned to be built as a modular timber construction. The design for all three schools is by the architects NKBAK from Frankfurt, who worked in a joint-venture together with Bollinger + Grohmann, Ecotec (MEP) and Franz Reschke Landschaftsarchitektur.

Photo: Thomas Mayer

29 July 2019

1st prize: Xingtai Science and Technology Museum

Coop Himmelb(l)au wins Science & Technology Museum Competition in Xingtai, China. Bollinger + Grohmann Ingenieure was in charge of structural engineering.

23 July – 30 November 2019

Research project RegoLight at “ZERO GRAVITY” exhibition

The exhibition “ZERO GRAVITY” revolves around concepts and ideas that defined and changed arts and science from the moment humankind stepped on the moon. Selected material from research project RegoLight, which Bollinger + Grohmann was part of between 2015 and 2017, will be a part of media artist Peter Kogler spatial installation at ERES-Stiftung in Munich.

Room installation by Peter Kogler, Ohne Titel, 2019, © the artist, Photo: Thomas Dashuber

4 July 2019

1st prize for "Kurfürstenstraße, Berlin"

Congratulations to the team of Barkow Leibinger who won the competition about the "Wohn- und Bürokomplex Kurfürstenstrasse" in Berlin. B+G gave technical advice.

© Image: Barkow Leibinger

24 July 2019

2nd prize for "Heinrich-Hoffmann-Grundschule, Darmstadt"

We are very happy about the 2nd prize, which Dietrich Untertrifaller Architekten received for the design of the "Heinrich-Hoffmann-Grundschule" in Darmstadt. B+G gave technical advice.

@ Image: Dietrich Untertrifaller Architekten

29 - 30 June 2019

Tag der Architektur 2019

"Räume prägen" - this is the motto of this year's nationwide Architecture Day. Of a total of 76 selected examples in Hesse, three structures are also open to the public, and B+G was involved in their realisation with structural and/or façade engineering:

Kornmarkt-Arkaden, Frankfurt
Residential and office building Berger-/ corner Höhenstraße, Frankfurt
Headquarters Europe Musterhausküchen, Dreieich

09 June 2019

Installation of the timber construction modules

After the Marie Curie School, the August Gräser School in Frankfurt is currently being extended by a modular timber construction. The installation and assembly of the 12 modules only takes two days. The new premises should be ready for occupancy by August. B+G was responsible for the structural design as well as for the building physics.

19 June 2019

1st prize with Nieto Sobejano Architectos

We are happy about one of two 1st prizes within the competition of the new event hall and hotel with underground parking in the Kaiserpfalzquartier in Goslar. B+G gave technical advice. Auer Weber won a further 1st prize.

© Visualization: Nieto Sobejano Architectos

12 June 2019

Sykehusområde på Bragernes, Drammen

I samarbeid med Powerhouse company og Skajaa arkitektkontor har B+G Oslo blitt engasjert i et parallelloppdrag for utvikling av sykehustomta på Bragernes i Drammen.

06 June 2019

Project Winner

We are very happy to announce that our project “Gradient” is the winner of the international engineering, architectural, landscaping and integrated art competition held by the City of Nyon related to the development of Greater Geneva.

May 2019

MOCAPE - "Steel Construction" Volume 12, 2019

The May issue of the magazine „Steel Construction“ features an article about the MOCAPE Museum in Shenzhen written by B+G.
The project even made it onto the cover!

27 May 2019

First prize for "Bildungscampus " in Pforzheim

Bruno Fioretti Marquez (BFM) won the competition for the "Bildungscampus" Pforzheim.
B+G supported the architects with the development of a 4- and 3-floor timber construction for two school buildings, a canteen and sports hall and the concept for the further development of three existing buildings.

22 May 2019

C40 Reinventing Cities: Winning project 'The Urban Village'

Teaming up within "The Urban Village Team" with LPO Architects / SLA, Bollinger + Grohmann won within the C40 Reinventing Cities competition. The site is located in the northeast of Oslo and aims to drive carbon neutral and resilient urban regeneration focusing on social, environmental and economic sustainability. Bollinger + Grohmann is involved as an environmental expert and for the structural design.

Image: ©The Urban Village Team

14. mai 2019

"Miljøvennlig materialbruk"

Michael Lommertz (B+G Oslo) vil holde flere kursinlegg om miljøvennlige materialer og gjenbruk i forbindelse med NALs kurs.

7 May 2019

Winner MKNO: C40 - Reinventing Cities

Together with Coldefy & Associates, Triptyque Architecture, SO-IL and as part of the team MKNO, Bollinger + Grohmann have been selected winners of the International Competition MBK in Bobigny - within the C40 Reinventing Cities to drive carbon neutral and resilient urban regeneration.

Bollinger + Grohmann is responsible for structural and façade engineering.

Image credit: © ArtefactoryLab / NODI

09 April 2019

Topping out ceremony of the K1 in Jena

The future residential and commercial building with around 5,870 m² of residential and commercial space will be Jena's first high-rise since German reunification.
Bollinger + Grohmann was in charge of the structural engineering.

March / April 2019

New publications by B + G

In March/April, B+G is represented with a total of three articles in the "Stahlbau" and "Beton- und Stahlbetonbau" (Verlag Ernst und Sohn):

1. "Hyundai Motorstudio Goyang",
Stahlbau 88 (2019), Heft 3, S. 223-233
2. "Moderne Parametrik in der Tragwerksplanung",
Stahlbau 88 (2019), Heft 3, S. 184-193
3. "Eso Supernova", Besucherzentrum und Planetarium,
Beton- und Stahlbetonbau 114 (2019), S. 1-8

30 March 2019

Topping out ceremony at the Barmbeker Bahnhof

The topping out ceremony of the new hotel and office building "Fuhle 101" in Hamburg Barmbek was celebrated at the end of March.
Architects: Bieling Architekten
Client: Development Partner AG und BL Gruppe
Structural Engineering: B+G

26 March 2019

Bollinger + Grohmann jetzt auch auf Instagram

With our new profile on Instagram, we extended our social media presence. We would like to use our account to give an overview and inform about our scope of work and projects during the different design and development phases. If you want to follow us, please use the link below:

6 March 2019

Deutscher Ingenieurbaupreis 2018

Stadtwerke Düsseldorf and B+G donate the prize money.

1 March 2019

Competition "Hafenpark Quartier Frankfurt": 1st prize

First prize for the hotel design at "Molenspitze" in Frankfurt for Barkow Leibinger. Bollinger + Grohmann gave expert advice in structural engineering.
From 01/03/ to 14/03/2019, the nine submitted designs will be exhibited in the atrium of the Stadtplanungsamt at Kurt-Schumacher-Straße 10 in Frankfurt.

28 February 2019

Frankfurt Pavilion wins the IDA Award

in the architectural category "Exhibits, Pavilions and Exhibitions". The new landmark of the Frankfurt Book Fair was designed as a temporary building and was opened in September 2018 for the first time.
Bollinger + Grohmann gave expert advice to the schneider+schumacher architects during the whole process and was in charge of the structural engineering.

28 February 2019

ISS Berlin-Mahlsdorf: topping-out ceremony

Yesterday the topping-out ceremony was celebrated at the Integrated Secondary School Berlin-Mahlsdorf. Both the modular school building and the sports hall will be built in timber.

27 February 2019

And another topping-out ceremony: Extension Hager building D

The electrical engineering group Hager expands its headquarters in Blieskastel by an office building for another 100 workplaces.
The planning company schneider + schumacher is responsible for the architecture and site supervision. Bollinger + Grohmann had already completed two buildings at this site together with them.

February 2019

JKU Campus - TNF Tower

The 18 metres tall steel grid construction of the new terrace at Johannes Kepler University in Linz is located on the TNF tower which is the tallest building on campus. The construction is planned to be completed in March 2019 which makes it the first of many new places for university visitors to discover!

11 February 2019

Tower of Power: Transport Design of the Year 2018

The public charging station by Göbl Architektur in Vienna is awarded Dezeen’s Transport Design of the Year 2018. A photovoltaic panel roof and a built-in wind turbine supply the station with necessary electricity to charge four electric cars and four electric bikes at a time.
Bollinger + Grohmann was responsible for the structural engineering.

9 February 2019

Franz Masereel Center: Opening

The opening of the extension of the Franz Masereel Center, in Kasterlee, Belgium took place on Thursday, 9 February 2019. The project has been designed by LIST and Hideyuki Nakayama Architects. B+G Paris & Brussels were already part of the competition team and afterwards responsible for the structural engineering.

Ido Avissar of LIST will give a lecture about the construction at the Pavillon de l’Arsenal in Paris, next Thursday, February 21th at 7pm.

November 2018

ECSN-Award: 2nd prize for Merck Campus in Darmstadt

We are very happy about the European Concrete Award 2018 for the Innovation Centre and Company Restaurant on the Merck campus in Darmstadt.

Januar 2019

Deichman Hovedbibliotek i Oslo : detaljert dokumentasjon i "Teknisk Ukeblad"

Januar-utgaven av teknisk ukeblad omtaler de avanserte konstruksjonene på Deichman Hovedbibliotek i Oslo. Bollinger+Grohmann har bidratt ifm. konstruksjonsteknikk og fasade.