de    |    en    |    fr    |    no

Die ideale Fassade

Daniel Pfanner im Gespräch mit Rudi Scheuermann und Benedikt Kraft, in: DBZ, der Podcast: Wir zeigen, wie gebaut wird und womit!, 17.11.2020

Deichmanske Bibliotek in Oslo - BIM-Kooperation mit hohem Planungsnutzen

in: baunetzwissen.de

Die Grenzen des Machbaren

Agnes Weilandt im Gespräch mit Katja Reich und Mariella Schlüter, in: DBZ, der Podcast: Wir zeigen, wie gebaut wird und womit!, 27.04.2020

Das Hochhaus: Herausforderung in jeder Hinsicht

OMNITURM Frankfurt von BIG ARCHITECTCS; Inka Emich, in: Peikko Connections, 2020

Printmaking Studio / Frans Masereel Centrum

GA Japan 160, Sep Oct / 2019

Parkapartments am Belvedere, Wien

Isabella Marboe, in: DBZ 10/2019, S. 29-42

Hoch über Wien schwebend

Brigitte Groihofer, in: Architektur & Bau Forum, Österreichischer Wirtschaftsverlag, Wien; 07-08/2019

Reziproker Rahmen: Frans Masereel Centerum in Kasterlee

Robert Mehl, in:www.structure-magazin.de

Paris-Saclay, Campus der Superlative

Ayers, Andrew, in: DETAIL, München, 3.2019, S. 30-31

Schwebende Black Box hinter Glas: Neubau Bauhaus Museum Dessau

Bärbel Rechenbach; in: Beratende Ingenieur, 3/4 2019

Sporthalle in Calais

in: DETIAL structure, 01/19, S. 40-45

Summe seiner Technik: active energy building, Vaduz

in: DBZ 7/8 2018, S. 54-59

Ces algorithmes qui viennent

Interview mit Klaas de Rycke, in: D'Architectures 256, September 2017, S. 51 - 55

Zwanzig vor zwölf - der Spreepark in Berlin

DER SPIEGEL, 37/2017, S. 36

Komplexe Grundrisse mit komplexen Schalungskonzepten realisieren

Allgemeine Bauzeitung, Patzer Verlag, 19. 08.2017

So sieht die Raststätte der Zukunft aus

NZZ, 18.08.2017

La parabole de l'acier

in: AMC, no 259, avril 2017, page 16 - 17

Der Zukunftspavillon verlässt die Stadt

FAZ, 22.03.2017, S. 30

Kraftwerk Lausward, Düsseldorf

in: Ausgezeichneter Stahlbau 2016, hrsg. vom bauforumstahl, Callwey Verlag, S. 72-75, München, 2016

Wellnessbad Aquamotion, Courchevel

in: Ausgezeichneter Stahlbau 2016, hrsg. vom bauforumstahl, Callwey Verlag, S. 90-91, München, 2016

King-Fahad-Nationalbibliothek, Riad

in: Ausgezeichneter Stahlbau 2016, hrsg. vom bauforumstahl, Callwey Verlag, S. 120-123, München, 2016

Europäische Zentralbank, Frankfurt

in: Ausgezeichneter Stahlbau 2016, hrsg. vom bauforumstahl, Callwey Verlag, S. 28-31, München, 2016

Un auvant métallique bien pensé

in: steeldoc, Stahlbau Zentrum Schweiz, Zürich, 03/16

Dachskulptur in Hochgebirgslandschaft

in: Beratende Ingenieure, VBI, Berlin, 9/10 2016

Das kann Schule machen

Süddeutsche Zeitung, 24.08.201

Ursprungsidee erhalten: Aquamotion de Courchevel

in: DBZ, Bauverlag, Gütersloh, 8/2016

Loci Anima, Cinéma Les Fauvettes, Paris

in: AMC N 252, S. 144-146

Cinéma - A Paris, pleins feux sur les fauvettes

in: Le Moniteur N 5862, S. 66-67

à voir: Musée des Confluences

in: Acier N°11, 12/2015, S.44-49

LAN - 40 logements et commerces - Paris XVIIe

in: AMC, 01/2016, S.98-99

Extension de la Collection Lambert, Berger & Berger

in: AMC, 01/2016, S.227

Märchenhafter Rundgang: Grimmwelt in Kassel

Das Museum von kadawittfeldarchitektur und B+G auf DETAIL online, 10.12.2015.

Un labyrinthe d'acier à la géométrie complexe

in: Les cahiers techniques du bâtiment N°345, 10/2015, S.11

Labyrinthe: un dédale de S235 à Genk, Belgique

in: D'Architecture n°239, 10/2015, S.110-115

Hochhaus in Wien

in: Detail, 06/2015, S.577-581

Parisian Lantern

in: SA Singapore Architect N°282, 08/2014 S.106-115

Le Carreau... se relève!

in: Nda magazine N°18, 07/2014, S.76-79

Reconversion de la halle du Carreau du Temple

in: Les cahiers techniques du bâtiment N°330, 02/2014, S.18-24

Une bulle de verre et d'alu émerge des toits

in: Le Moniteur N°5752, 02/2014, S.36-39

Travailler dans une icône

in: Le Moniteur, numéro spécial 11/2014, S.48-52

L'Alchimie entre un musée et un paysage

in: Le Moniteur N°5747, 17/01/2014, S.30-35

La Fondation Pathé se la joue Piano

in: Le Moniteur N°5780, 05/09/2014, S.8-9

Reconversion urbaine, le Carreau du Temple sort le grand jeu

in: CMI N°2, 2014, S.24-30

Le Carreau du Temple

in: Acier N°9, 10/2014, S.8-13

Du meuble au lieu, entretien avec Inessa Hansch

in: D'Architecture n°231, 11/2014, S.98-101

Un bain de jouvence pour Hermès

in: Bois mag N°129, 09/2013, S.24-27

From a grey industrial zone to an outstanding sustainable community

in: Sustainable cities, 06/2013

Le Musée des Confluences reçoit les écailles de sa carapace

in: Le Moniteur N°5718, 28/06/2013, S.38-39

Le Louvre Lens joue l'effacement

in: Le Moniteur N°5702, 08/03/2013, S.20-25

Le Louvre Lens, un musée paysage

in: D'Architecture n°215, 03/2013, S.73-77

Musée des Confluences, une charpente sur un nuage

in: CMI N°5, 2013, S.30-35

Fondation Jerôme Seydoux-Pathé, complexe mise en scène

in: l'Architecture d'Aujourd'hui N°394, 03/2013, S.79-89

Un cristal à puits de gravité

in: AMC N°231, 03/2014, S.86-87

Les Confluences entre deux eaux

in: Le Monde, Culture & Idées, 20/12/2014, S.4-5

Béton, acier et verre au musée des Confluences

in: Le Moniteur N°5663, 08/06/2012, S.40-44

Saclay, l'Ecole Centrale sur le plateau en 2016

in: Le Moniteur N°5680, 05/10/2012, S.96

Le laboratoire urbain Paris-Saclay accueille l'Ecole Centrale du XXIè siècle

in: Le Moniteur N°5680, 05/10/2012, S.50-52

Des huttes pour un show-room

in: Le Moniteur N°5608, 20/05/2011, S.28-31

Une demi-sphère vitrée pour la Fondation Seydoux-Pathé

in: Les cahiers techniques du bâtiment N°9, annuel 2013, S.32-34

Radiante neutralité, Collection Lambert Avignon

in: D'Architecture n°238, 09/2015, S. 74-81

OFFICE Kersten Geers David Van Severen: Campus RTS

in: ARCH+ N°220, 13.08.2015, S.184-189

Fassaden - Façades | best of DETAIL

Die Veröffentlichung basiert auf Beiträgen, die von 2010 bis 2014 in der Fachzeitschrift DETAIL erschienen sind. Darunter 3 Projekte von B+G: Louvre Lens, Betriebsgebäude Vitra sowie die King Fahad Nationalbibliothek.

La nouvelle vie du Carreau du Temple

in: Archiscopie N°1, 01/2015, S.51-56

Ovaldach Messe Frankfurt - Tor Nord

in: Detail structure, München, 01/2015

Les nouveaux temples du StudioMilou

in: Connaissance des arts, 09/2014, S.92-95

TU-Neubau: Parken hinter reizvoller Fassade

in: Darmstädter Echo, 10.07.2014

Parkhaus auf der Lichtwiese für fast 500 Autos

in: FAZ, Frankfurter Allgemeine Zeitung, Rhein-Main, 10.07.2014, S. 48

L'insomnie de Dominique Perrault

in: Le courrier de l'architecte, Paris. 19.03.2014

Autobahnkirche in Wilnsdorf

in: DETAIL, 2014, 1/2, S. 53

Nationalbibliothek in Riad

in: DETAIL Planen und Bauen als Prozess, Serie 2013, 12. S. 1412 - 1422

Aufstrebendes Fachwerk: Europäische Zentralebank, Frankfurt a. M.

in: DBZ 11, 2013, S. 66 - 69

Cappella sull’Autostrada del Siegerland

in: THE PLAN 069, 10/2013

DC Tower fertig, aber nur halb voll

in: Die Presse, Wien, 27.09.2013, S. 9

Autobahnkirche Siegerland

in: DAM Jahrbuch 2013, Prestel Verlag, S. 100 - 105

Tankstelle für die Seele

in: DOMUS, 09/2013, S. 41

Wo Beten noch helfen soll

in: FAZ, Frankfurter allgemeine Zeitung, 14.08.2013, S. 27

Gott muss Fernfahrer sein

in: MODULOR, 07/2013, S. 50 - 58

Filmbeitrag über Bollinger+Grohmann

ARTE, Metropolis, 16:45 Uhr

Berührende Rast

in: AIT, 06/2013

Musée du Louvre

in: The Architectural Review, 03/2013, S. 28-43

Musée du Louvre

in: architektur aktuell, the art of building, 03/2013, S. 96-107

PGE Arena Gdansk

in: DETAIL, Das Architekturportal, 21.06.2012

Polens nye lekegrind for EM-fotball

in: Aftenposten (Oslo), 06.06.2012

Walking on the moon

in: Mark - Another Architecture, No 26, S. 95-104

Unter dem Putz liegt die Revolution

Monolithische Bauweise für den Mehrgeschossbau, in: DBZ, 5/2012, S. 82-84

Nur noch 40 Meter bis zum Dach

in: FAZ, 27.04.2012, S. 45

Schönes Stadion, wenig Stimmung: Deutsches EM-Quartier Danzig

in: Spiegel online

Let´s Twist

in: Architectural Record, April 2012

18 Mal Pflicht und Kür

in: FAZ, Rhein-Main, 12.03.2012, Wettbewerb Henninger Turm, Frankfurt

Grimm-Welt Kassel

in: wa - wettbewerbe aktuell 3/2012

PGE Arena: An Amber for Gdansk

hrsg. v. RKW Rhode Kellermann Wawrowsky, Düsseldorf, 2012

Unter der Erde im Tageslicht

in: Neue Zürcher Zeitung, 28.02.2012, S. 46

Schatzkammer mit Lücken

in: taz, 28.02.2012, S. 15

Schampus und Currywurst

in: die Zeit, Nr. 9, 23.02.2012, S. 45

Hohe Kunst im tiefen Keller

in: FAZ, 22.02.2012, Titelblatt

Unterirdisches Glück im Neuen Städel

in: FAZ, 22.02.2012, S. 29

Im Rausch der Tiefe

in: Frankfurter Rundschau, 22.02.2012; Titelblatt

Kunst unter der grünen Wiese

in: Frankfurter Rundschau, 22.02.2012, S. 2

Wohlfühlen im Business Room

in: Frankfurter Rundschau, 16.02.2012, F20

Neues Parkhaus am Flughafen eröffnet

in : FAZ, 14.02.2012, S. 38

Der Schatzmeister

in: mobil, Magazin der Deutschen Bahn, 02/2012, S. 70

Leuchtturm: Medizinische Fachbibliothek O.A.S.E., Düsseldorf

in: DBZ, Bauverlag, München, 2/2012, S. 60 - 67

Tragende Haut: Fassadenkonstruktion der O.A.S.E.

in: DBZ, Bauverlag, München, 02/2012, S. 68-73

Zum Abschluss Wohnungen und ein Spa

in: FAZ, 28.01.2012, S. 40

Das neue Städel ist ganz grün

in: Frankfurter Neue Presse, 09.12-2011, S. 15

Ein Haus mit Geschichte

in: Darmstädter Echo, 17.11.2011, S. 10

White Noise

in: Bauwelt 23/2011, Thema Digitales Entwerfen, S. 22-25

Mini-Metro in 18 Metern Höhe

in: FAZ, 04.10.2011, S. 40

Ein Wolkendach, wie hingehaucht

in: DBZ, 10/2011, S. 50-57

Neubau Geisteswissenschaftliche Fakultät der Universität Kassel

in: wettbewerbe aktuell, 10/2011, S. 97-99

Schumi, Rhino und Co.: ein Kirchendach als selbsttragende Karosserie

in: DBZ, Bauverlag, München, 10/2011, S. 58-60

Frankfurter Passagen, Karmeliterkloster, Goethehaus, Mainterrasse

in: Frankfurter Rundschau, 17./18:09.2011, S. 30-31

Kampf um die Banane

in: Frankfurter Rundschau, 16.09.2011, F9

"Schulstadt" am Riedberg

in: FAZ, 13.09.2011, S. 46

Wo sich Musik und Vogelgesang treffen

in: FAZ, 09.09.2011, S. 40

Probelauf im goldenen Bernstein

in: Frankfurter Rundschau, 06.09.2011

Das unmögliche Bankhaus

in: DBZ, 9/2011, S. 54-61

Plongeon dans l´histoire de trois huttes en frêne

in: le courrier du bois, 1er trimestre 2011, S. 10-12

Das Gymnasium wächst

in: Frankfurter Runschau, 26.08.2011, F10

Die ersten 100 Meter sind geschafft

in: Frankfurter Neue Presse, 22.08.2011

Wohnhochhaus für Frankfurter Europaviertel

in: FAZ, 22.07.2011, S. 41

Le Louvre Lens dévoile ses galeries

in: Le moniteur, 1er Juillet 2011, S. 48-50

Das Ende der Scheußlichkeit,

in: Frankfurter Rundschau, 17.06.2011, F14

Drei Holzkörbe im Hotel-Schwimmbad

in: Holz-Zentralblatt, Nummer 21, S. 526

Schwimmbad

in: Bauwelt, 17.11

Keltenfürst kehrt auf Glauberg zurück

in: FAZ, 23.04.2011, S. 55

Mit 195 runden Oberlichtern in die letzte Bauphase

in: FAZ, 11.03.2011, S. 37

195 Oberlichter markieren den unterirdischen Städel-Neubau

in: Darmstädter Echo, 11.03.2011, S. 8

IIIᵉ : la mue du carreau du Temple

in: Le Parisien, 06.01.2011, S. V

Berufskollegs in Recklinghausen / Vocational Schools in Recklinghausen

in: Detail, 1/2 2012, S. 59-63

Centre de céramique contemporaine

in: AMC N°202, 12/2010, S.176

Bodenwellen

in: Learning Center EPFL; Tec 21 2010/26; Verlags-AG; S. 23

Wir bauen hier die Zukunft

in: Die Rheinpfalz, Nr. 264, 13.11.2011

Passivhäuser – jetzt auch ohne Zusatzdämmung

vorgestellt auf dem Architekturportal www.detail.de/Green

Eine Welle zum Surfen - Rolex Learning Center, Lausanne

in: DBZ, 7/2010, S. 16-21

Löchrige Fassade: Die Arbeiten an der Großmarkthalle haben begonnen

in: FAZ, 16.06.2010, S. 38

Centrum edukacyjne w Lozannie

in: Architektura Murator, 06/2010, S. 98-105

Glooiende vlakken

in: cement, 5/2010, S. 76-79

Rolex Learning Center Lausanne (CH) SANAA

in: de Architect 70 , mei 2010, S. 54-59, S.

Learning Center Features Open Design

in: Civil Engineering, May 2010, S. 20

Rolex Learning Center in Lausanne

in: Detail 5/2010, S. 470-478

Campus mit Teppichlandschaft

in: Bauwelt 13/2010, S. 14-23

Een geslaagd compromis

in: AWM 33, april/mei 2010, S. 114-119

Die getarnte Wetterstation - Wetterradaranlage Langen/Dreieich

in: Frankfurter Rundschau, 13.03.2010

Die Bibliothek als Hügelllandschaft

in: Neue Zürcher Zeitung, 13.02.2010, S. 55

Die stillen Stars: Klaus Bollinger- und Manfred Grohmann, Frankfurt am Main

in: DBZ, Bauverlag, München, 10/2009, S. 88-93

Vom Baum zum Brett

in: db, 06/2009, S. 22

Mit Respekt und eigenem Ausdruck

in: Frankfurter Rundschau, F2/F3, 05.12.2008

Erweiterung des Städelmuseums in Frankfurt am Main

in: Bauwelt 12/2008 (177/2008), S. 176/177

Äußerst flache Schalen

in bauwelt, 42/2008, S. 34

König-Fahad-Nationalbibliothek - Nachhaltige Kooperation in Riad

in: BI, VBI-Magazin für Planen und Bauen, Ausgabe 9-10, S. 26

Actus - Coop Himmelb(l)au, BMW Welt

in: Architecture Acier Construction, 10/2008

Nachhaltige Kooperatin in Riad

in: BI, 9/1 2008

Qualitativ funktional

in: industrieBAU, 06/2008, S. 29-31

Eine umstrittene Kathedrale für den Riesling

in: FAZ, 29.05.2008, S. 57

Form, Force, Perfomance - Multi Parametric Structural Design

in: AD Versatility and Vicissitude, hrsg. von M. Hensel und A. Menges, Wiley-VCH, Weinheim 5/2008

Start für Österreichs höchsten Wolkenkratzer

in: ORF.at, 26.04.2008

Architektura poprzez technike. Szkoła na terenach Zollverein w Essen

in: Architektura Murator, 2/2008

Innovative Schalungspläne für Optimale Lösungen im Betonbau

in: Detail, 01.02.2008, S. 92

Neue Hungerburgbahn- Innsbruck

in: Informationsschrift der Lichtgruppe Gantenbrink 2- 2008, S.4-10

So bauen wir heute (Jahrbuch DAM)

in: FAZ, 19.01.2008, S. 54

Architektura poprzez technike. BMW Welt w Monachium

in: Architektura Murator, 1/2008, S. 84

Dekonstruktive corporate Architecture

in: archithese, 6/2007

Glasskulpturen im Gebirge

in: Neue Zürcher Zeitung, 18.12.2007

Gletscher mit den Händen bauen

in: Der Standard, 15.12.2007

COOP HIMMELB(L)AU: BEYOND THE BLUE, Ausstellungskatalog, Prestel, München 2007

Projekte: UFA Palast, JVC Center, Musée des Confluences, BMW-Welt, Akron Art Museum, House of Music, EZB, Busan Cinema Complex, Rhein-Main-Arena u.a.

Den Menschen den Berg näher bringen

in: FAZ - Technik und Motor, 11.12.2007

BMW-Welt, Munich, Germany

in: THE PLAN, 12/2007, S. 077

International wahrnehmen, Architekturexport auf der 7. internationalen Architekturbiennale Sao Paulo

in: DBZ, 12/2007, S. 18

Im Tempel der Direkteinspritzung

in: Stern, 15.11.07

BMW-Welt, München

in: wettbewerbe aktuell 11/2007, S. 89

Emotionale Dynamik

in: build, 5/2007, S. 18

Das Solar-Ufo von München

in: FAZ - Rhein-Main-Markt, 03.11.07, S. 17

BMW Welt, München

in: Wettbewerb aktuell, 11/2007,S. 89-94

Coop Himmelb(l)au, Wien

in: Deutsche BauZeitschrift, 11/2007

Car-chitecure: New Museums Enshrine the Brand

in: The Wall Street Journal, 05.10.07

Einen Wirbelsturm bauen

in: Bauwelt, 31 / 2007, S. 26

Barock ´n´ Roll

in: Süddeutsche Zeitung, 02./03.10.07, S. 15

Dynamic Forces

in: hrsg. v. Kristin Feireiss, Prestel, München, 2007

Doppelte Schale, roter Kern

in: Bauwelt 33/07, S. 30

Fast jeder Neuwagen ein Museumsstück

in: db, 7/07

Carreau du Temple: le projet est choisi

in : 24 HEURES A PARIS, 07.09.07

Zwei Münchner im Himmel über Moskau

in: Süddeutsche Zeitung, 12.06.07, Wettbewerb Crown Towers Moskau

Zyprisches Kulturzentrum in Nikosia, Zypern

in: wettbewerbe aktuell 06/2007, S. 5, Wettbewerb Zyprisches Kulturzentrum

Musée des Confluences: du rififi chez les hommes du bâtiment

in: Le Progrés, 17.05.07, S. 4

Quand Coop Himmelb(l)au prouve son savoir-faire

in: Le Progrès, 17.05.07, S. 4

Fußgängerbrücke über die Theel in Lebach

in: wettbewerbe aktuell 5/2007, S. 35

Rotorblätter über der Stadt

in: archithese 5/2007, S. 46

Auf dem Weg ins Ausland, Ready for Take-off

in: Deutschland, Forum für Politik, Kultur und Wirtschaft, 5/2007, S. 41

Knallharte Lufballons

in: Frankfurter Allgemeine Zeitung, 04.07, Projekt Solar-Ballons von T. Saraceno auf der Biennale Sharjah 8

Urbane Verdichtung mit effizienten Hochhäusern

in: Die Presse, Sonderbeilage, 31.03.07, S. 1

Architektur und Macht

in: Süddeutsche Zeitung, 26.03.07, S. 22

Petersburger Schlittenfahrt

in: db, 20.03.07, S. 6

Im Juni soll der Deckel drauf sein

in: Wiesbadener Kurier, 15.03.07, S. 4

Donaucity: Hochhaus streck dich

in: Der Standard, 07.03.07, S. 9

Baubeginn für EZB-Hauptsitz im Frühjahr 2008

in: FAZ, Rhein-Main-Zeitung, 21.02.07, S. 41

Hohe Scheiben und ein verdeckter Altbau

in: Frankfurter Rundschau, 21.02.07, S. 25

EZB baut die "vertikale Stadt"

in: Frankfurter Rundschau, 21.02.07, S. 23

Nach russischen Regeln

in: BauNetz, 13.02.07, Meldungen

Les coûts s'envolent pour le Louvre à Lens

in: Le Monde, 08.02.07

Petersburger Sumpf

in: Süddeutsche Zeitung, 06.02.07, S. 13

BMW-Welt München - die Stahlkonstruktion in der realen Umsetzung

in: Stahlbau 74 (2005), Heft 7, S. 492

Die Bildmaschine

in: der architekt 01/07, S. 14

Hamburg, der Architekturführer, Verlagshaus Braun, 1 Aufl. 2007

Projekte: Gemeindehaus Nikolai, Medienpool Waterloohain, Rolandsbrücke

Am Doppelkegel hängt das Dach wie eine Wolke

in: Frankfurter Allgemeine Zeitung - Technik und Motor, 19.12.06, S. T5

Zollverein School of Management and Design

in: DAM Jahrbuch 2006, S. 154

Wie man durch eine Gemüsekirche säbelt

in: Süddeutsche Zeitung, 04.12.06, S. 13

Take off

in: max 40, 2006, S. 28

Take off - Spatial installation in terminal 2 at Munich Airport

in: Contemporary Public Space, 2006, S. 370

Die Hauszersetzer

in: FAZ Sonntagszeitung, 26.11.06

Auch Denkmalpfleger finden sich mit Eingriffen in Großmarkthalle ab

in: Frankfurter Allgemeine Zeitung, 11.10.06, S. 45

Im Neubau ist Platz für Forschung

in: Frankfurter Rundschau, 27.09.06, S. 30

Im Master-Werk

in: Süddeutsche Zeitung, 05.09.06, S. 12

Seebad Kaltern - Skulpturale Flächentragwerke

in: Beton- und Stahlbetonbau 101/2006, Heft 8, S. 622

Ganz schön verwegen

in: Financial Times Deutschland, 31.08.06, S. 32

Stahlbalkon der Träume

in: Mitteldeutsche Zeitung, 12.08.06, S. 23

Wahrzeichen für Region Bitterfeld

in: Mitteldeutsche Zeitung, 05.08.06S. 15

Landesgartenschau Wernigerode 2006

in: Wettbewerbe aktuell, 8/2006, S. 87

Golliwogg´s Cakewalk

in: Bauwelt 32/2006, S. 24

Stabil mit vielen kleinen Kugelgewölben

in: FAZ Technik und Motor, 25.07.2006, S. 6

Hochhausprojekte gesucht

in: Frankfurter Allgemeine Sonntagszeitung, 03.07.6, S. V13

Musiktheater für das Landestheater Linz

in: wettbewerbe aktuell 7/2006, S. 43

Busan Cinema Complex, Korea

in: wettbewerbe aktuell 7/2006, S. 29

Auf Zollverein - Architektur und Design vereint

in: adato, 4/06, S. 14

Bankgebäude Dexia Bil Esch sur Alzette, Luxemburg

in: adato, 4/06, S. 41

Lichtdächer unter der Schnellstraße

in: Bauwelt 19/2006, S. 42

Neubau für den Portikus

in: Bauwelt 18 / 2006, S. 4

Frankfurts Leuchtturm a.M.

in: Frankfurter Rundschau, 03.05.06, S. 15

Stadt in der Stadt

in: IHK Wirtschafts Forum 05 / 06, S. 48

Manifest gegen die modernistische Bigotterie

in: Die Welt, 18.04.06, S. 23

Na granicy mozliwosci - Kunsthaus w Grazu

in: Architektura murator, 04 / 2006, S. 88

Die Rötheste kehrt zurück

in: Frankfurter Allgemeine Zeitung, 31.03.06, S. 39

Deckenbau am Beispiel des Sanaa-Buildings im Novartis-Campus

in: der bauingenieur, 02/2006, S. 68

Zustimmung für überarbeiteten EZB-Entwurf

in: Frankfurter Allgemeine Zeitung, 17.01.06.

Schnitt durch die Großmarkthalle

in: Frankfurter Rundschau, 11.01.06, S. 30

Erweiterung des Bauhaus-Archivs

in: Bauwelt 1-2 2006, S. 8

Neubau eines kommunikationszentrums, Rheinau

in: Glas 01/06, S. 4

SON-O-House - Nox

in: 4d space, 2005, S. 70

Entscheidung über EZB-Turm vertagt

in: Frankfurter Rundschau, 19.11.2004, S. 34

Anerkennung für Farbenspiel und Transparenz

in; Frankurter Rundschau, 25.10.05, S. 37

Weiches Licht und blanker Beton

in: Frankfurter Allgemeine Zeitung, 19.07.05, S. 42

Ein Ort für Bücher und Bilder aus aller Welt

in: Frankfurter Rundschau, 09.07.05

U-Bahn Station Heddernheim

in: Frankfurter Allgemeine Zeitung, 25.06.05, S. 38

So edel wie die Alte Stadtbibliothek

in: Frankfurter Rundschau, 22.06.05, S. 35

Eine Halle aus Glas und Stahl

in: Frankfurter Allgemeine Zeitung, 21.05.05, S. 41

Perforierte Kuben im Kornfeld

in: industrie BAU, 03/2004, S. 24

Baubeginn für neuen "Portikus" im Frühjahr

in: Frankfurter Allgemeine Zeitung, 04.02.05, S. 48

EZB-Turm soll Symbol für Europa werden

in: Frankfurter Rundschau, 21.01.05

EZB will im Jahr 2010 in neuen Turm umziehen

in: Frankfurter Allgemeine Zeitung, 21.01.05, S. 49

EZB-Türme wachsen auf 184 Meter

in: Frankfurter Rundschau, 14.01.05, S. 30

Die neue Heimat des Euro

in Frankfurter Allgemeine Zeitung, 14.01.05, S. 11

Ein Hochhaus als Machtgeste

in: Frankfurter Allgemeine Zeitung, 14.01.05, S. 45

Klangpavillon, SON-O-House in Ekkersrijt

in: Baumeister, 1 /2005, S. 72

Der Campus wächst

Projekt Campus Casino JWG-Universität

Der Pariser Platz in Berlin als Vorbild für den Campus Westend

in: Frankfurter Allgemeine Zeitung, 14.12.04, S. 41

Wetten auf Coop Himmelb(l)au

in: Frankkfurter Allgemeine Zeitung, 04.11.04, S. 48

Ein Vier-sterne-Hotel ist das erste Haus im Europaviertel

in: Frankfurter Rundschau, 13.05.04

Das Projekt "Skywaves"

in: Umrisse, 5/6 2004, S. 1, Wettbewerb Hangar A 380

Friendly Alien - Das Kunsthaus Graz

in: Fassade/Façade, 4/2004, S. 37-42

Ein schickes Hochhaus für die Fernsehnachrichten

in: Frankfurter Allgemeine Zeitung, 07.03.04, S. 42

Städtbaubeirat für 180-Meter-Turm neben der Großmarkthalle

in: Frankfurter Allgemeine Zeitung, 05.03.04, S. 56

Ingenieure Bollinger und Grohmann - Partner im Entwurfsprozess

in: Industrie BAU, 03/2004, S. 63

V wie Fernwirkung

in Frankfurter Rundschau, 21.02.04, S. 15

Eindeutige Sieger über schwache Konkurrenz

in: Frankfurter Allgemeine Zeitung, 21.02.04, S. 57

Zentralbank will keine Festung sein

in: Frankfurter Rundschau, 21.02.04, S. 25

Zurück aus Utopia: Coop Himmelb(l)au siegen im Wettbewerb Europäischen Zentralbank

in: Frankfurter Allgemeine Zeitung, 17.02.04, S. 33

Die Mieten im Ostend steigen jetzt schon

in: Frankfurter Rundschau, 17.02.04

Alte Großmarkthalle soll Eingang der EZB werden

in: Frankfurter Allgemeine Zeitung, 14.02.04, S. 57

Lob für Siegerentwurf von Coop Himmelb(l)a

in: Frankfurter Allgemeine Zeitung, 14.02.04

Erweiterung der Hölderlinschule

in: bauwelt, 39/04, S. 004

5.000.000 m³ Wien. Die neuen Großprojekte

in: Bauwelt 30 / 2003, S. 4

Rotes Minimum

in: Frankfurter Rundschau, 10.04.02, S. 18, Infobox Westhafen

Knallroter Turm in Aussicht

in: Frankfurter Rundschau, 28.02.02, S. 29, Infobox Westhafen

Begehbarer Tetraeder aus Stahl

in: Stahlbau, 6/1997, S. 248

27 April 2021

Competitionline Ranking 2020

The competitionline-Ranking is the only architects' ranking in the German-speaking world that is based exclusively on competition results. Once a year, the competitionline editorial team evaluates all the competition results published on competitionline.com and creates the ranking of the most successful offices from them.

We are very pleased about the good rankings of our office in the following categories:

3rd place in the category STRUCTURAL ENGINEERS
6th place in the category CIVIL ENGINEERS
3rd place in the category BUILDING PHYSICS

April 2021

2nd place in competition: NICE HQ, Oderzo

"Nice Headquarter" is designed as a high-tech building. The key characteristics are the transparency and lightness of the façades and the roof, which is a monolithic element that opens and closes according to the sun position and weather conditions. It provides a dynamic and flexible space for the inner courtyard.

A set of integrated lights enhances the building's perception at night, maintaining a high level of visibility and a sober profile blending with the surrounding environment.

Bollinger+Grohmann was responsible for structural and façade engineering.

©Photo: Park Associati and Bollinger+Grohmann

12. April 2021

Stefan Polónyi (1930–2021)

We received the sad news that Stefan Polónyi has passed away on April 9.

Stefan Polónyi was a leading builder, master teacher, inventor, pioneer and role model. His exemplary contribution in science, teaching and practice strengthened the self-image of engineers and consistently enhanced constructive interaction between architects and engineers. We will miss him. Our thoughts are with his family.

Photo: Benedikt Kraft

1 April 2021

Green & Blue Building Award

The Ilse Wallentin-Haus is the recent timber construction at the University of Natural Resources and Life Sciences, Vienna (BOKU). The project received the Green & Blue Building-Award in the category “Project” for the focus on sustainability during the development as well as for the use of recyclable & renewable materials.

Client: BIG Bundesimmobiliengesellschaft m.b.H.
Architect: SWAP Architekten, Delta Projektconsult
Structural Engineer: Bollinger+Grohmann

Congratulations to the entire project team!

30 March 2021

International Competition in Sicily: Finalist

Our project was one of the 5 finalists in the International Competition for the new Administrative Centre of the Sicilian Region. It was great to participate in such a challenging and innovative project! Congratulations to the whole team:

Studio Transit, Studio Valle Progettazioni, Studio Faraone, Studio Cangemi, United Consulting, Bollinger+Grohmann, Gae Engineering, Studio A&P architettura del paesaggio with Eleonora Tomassini, Vamirgeoind, Fabio Roncato


Image: HERE S.r.l. with ENGRAM

March 2021

Riedbergallee Student Residence: Process

The timber structure of the 5-story student residence (timber and concrete hybrid) is rising in high speed. The prefabricated CLT wall and slab elements, which span up to approx. 8 m, arrive with all necessary openings and milled slots for the service pipes and are mounted next to the buildings concrete cores and compartment walls. Together with Ferdinand Heide Architects from Frankfurt we started planning in early 2018 and were responsible for the structural engineering (LP1 to LP6) and building physics (LP1 to LP7).

Photo: Kai Laumann

09 March 2021

Panoramic lift for the Buga Erfurt 2021

The two 27m long, very light and narrow walkways to the bastion on Petersberg were lifted into place yesterday. They connect the free-standing elevator tower with the massive bastion wall. On the city side, the small platform at the elevator tower offers a great view to the cathedral square and the historic centre.

Architecture: Schulitz Architects
Structural Engineering: Bollinger+Grohmann

Photo: Schulitz Architects

February 2021

AIT Award Finalist 2020

The AIT awards are one of the largest competitions for architecture and interior design in the world. The Frankfurt Pavilion by schneider+schumacher and Bollinger+Grohmann was among the finalists in the category Retail/Fair.

The iconic building was constructed for the first time at the Frankfurt Book Fair in 2018 and returned again as the venue for events with authors and industry experts from all over the world in 2019. The space-defining structure was generated and optimized by the team, taking into account architectural, structural and static criteria using genetic algorithms.

15 February 2021

"WOOD. Change the present. Build the future."

After one year of research on timber structures, Bollinger+Grohmann and Park Associati are working on a publication to collect all the information. How did we get the results of our research on wood? We combined our expertise through the applied exercise of re-engineering.

February 2021

Fritz-Kissel-Siedlung, Frankfurt: Process

The speedy construction process in Frankfurt's Fritz-Kissel-Siedlung is impressive. After the building permit was granted in September 2020, the first tenants moved into the apartments in mid-December.

Since several construction steps happen at the same time, you can follow every timber module addition phase on the construction site.

Bollinger+Grohmann was already in charge of the feasibility study for fire protection and the structural design for the extension in 2017. We are now responsible for the entire fire protection concept and the structural engineering for the existing structures.

January 2021

Second Annual USGlass Design Awards: Recognition for MoMA NY

We are happy to share that our project "Extension of The Museum of Modern Art", has been recognized in the Second Annual USGlass Design Awards, winning in the low- to mid-rise construction category.

As part of the façade team with FRENER & REIFER , Bollinger+Grohmann were responsible for the structural analysis, building physics proofs, design-assist, construction document phase, workshop and assembly planning of the façade.

January 2021

Digital Media House of the "Rundfunk Berlin-Brandenburg"

After Baumschlager Eberle Architekten won the Berlin-Brandenburg Broadcasting rbb "Digital Media House and Campus Development" project in summer 2020, Bollinger+Grohmann were chosen as planners for structural engineering, façade engineering and building physics.

The new building will combine cross-media working and production processes, moreover intensify the cooperation of radio, online and television.

Visualization: rbb/Baumschlager Eberle Architekten

21 January 2021

Architizer A+Firm Awards 2021: Distinction

The A+Firm Awards spotlight engineers and professionals from the AEC sector.
We are very pleased that Bollinger+Grohmann has been selected as one of the five Finalists in the Best Engineering Firm category!

December 2020

FOUR Frankfurt: Construction progress

After the start of the special foundation civil engineering in 2019, FOUR, our large-scale construction site has reached the foundation pit in partial cover construction. The reinforcement of the first-floor slab section has been laid and from now on it will go up parallel to the basement levels with the high-rise buildings.
Together with our ARGE partner Werner Sobek Frankfurt, we congratulate all those involved in the project on reaching this milestone.

15 January 2021

Opening Tondo in Brussels

On Thursday 14 January 2021, the footbridge Tondo officially opened in Brussels.

Designed by Office KGDVS, the "spatial element" connects the House of Representatives’ offices with its recent extensions, the new Forum Building, on the other side of the Leuvensestraat. It can be described as a stiff disc, the roof, on which the floor hangs with a minimal presence of structure.

Bollinger+Grohmann has been responsible for the structural engineering.

14 January 2021

B+G Brussels has just moved!

New year, new office, same nice team now in Rue de la Loi, Wetstraat 26, 1040 Brussels.

We look forward to meeting you there very soon!

14 January 2021, 4 pm - 5 pm

BAU Online 2021: Book presentation "Nachhaltigkeit, Ressourceneffizienz und Klimaschutz“

In March, the new handbook "Sustainability, Resource Efficiency and Climate Protection" is going to be published by Ernst & Sohn. The aim is to summarise the current state of the art for civil engineers and the construction industry with constructive solutions for planning and building and to provide assistance and orientation.

December 2020

"Architektur fertigen. Konstruktiver Holzelementbau."

The new Triest Verlag publication has been available in bookshops for two weeks. The book focuses on design and planning strategies with regard to their professional practice.

In the contribution about "Digital Design - Hacking the digital chain", our colleague Agnes Weilandt introduces the method of parametric design and uses several project examples to show how the design can emerge in a system of synchronous design, technical feasibility and production.

24 December 2020

Takk for samarbeidet, beste ønsker for 2021!

Bollinger+Grohmann tar ferie i romjulen. Vi stenger kontoret vårt de følgende dagene:

Frankfurt: 24 Dec 2020 – 1 Jan 2021
Berlin: 22 Dec 2020 – 1 Jan 2021
Munich: 24 Dec 2020 – 1 Jan 2021
Stuttgart: 23 Dec 2020 – 10 Jan 2021
Vienna: 24 Dec 2020 – 1 Jan 2021
Budapest: 21 Dec 2020 – 1 Jan 2021
Oslo: 23 Dec 2020 – 1 Jan 2021
Melbourne: 24 Dec - 15 Jan 2021

Vi gleder oss til videre godt samarbeid i 2021.

Picture: M. Süß

December 2020

Project office in Milan

Bollinger+Grohmann has a second location in Italy with a project office in Milan from January 2021. The key contact is Tommaso Pagnacco. As branch manager, he will be working in close cooperation with Stefano Cammareri as managing director of Bollinger+Grohmann Ingegneria S.r.l.

We are already engaged with well-known Milanese architects on challenging projects, in the field of research and development and on competitions as well. We are now looking forward to new and exciting opportunities.

Image: Alberto Feltrin

24. November 2020

2nd Annual Symposium Ingenieurbaukunst – Design for Construction

On 24 November 2020, the 2nd Symposium called Ingenieurbaukunst - Design for Construction takes place and the motto is "Climate protection, resource efficiency and what's next?".

Christoph Gengnagel (Bollinger+Grohmann | UDK Berlin) participates together with Uwe Heiland, SEH Engineering at 14:30 in the panel discussion "The increase of high tech is low-tech".

The entire event will be broadcasted online from the Berlin-Brandenburg Academy of Sciences and Humanities.

24 November 2020

The Interdisciplinary Academic Center of the Digital Cultures in Nantes won the Equerre d'Argent in the "Activities" category.

Architects: LIN en collaboration avec F.au

November 2020

Daniel Pfanner in DBZ podcast and November issue

The DBZ team discusses within the DBZ podcast relevant questions about architecture, construction technology and building practice. Daniel Pfanner talks in the DBZ podcast and the November issue about "the ideal façade" in the course of the expert talk by the "NEXT Expertenforum" alongside with Rudi Scheuermann, Director and Global Leader Building Envelope Design from Arup and Benedikt Kraft, deputy editor-in-chief of DBZ in the Next Studio in Frankfurt.

Picture ©Benedikt Kraft / DBZ

October 2020

Deichman vant Betongtavlen

The Norwegian award "Betongtavlen" is given to buildings in which concrete is used in an ecologically, aesthetically and technically outstanding way.
The library was designed by the architects Lund Hagem Arkitekter and AtelierOslo. Bollinger+Grohmann is responsible for structural engineering.

©Picture Einar Aslaksen / Pudder Agency

10 November 2020

Emporis Skyscraper Award

This is the twentieth time that the Emporis High-Rise Award. The 164 m high Leeza SOHO Tower in Beijing takes 2nd place and Frankfurt's Omniturm is in 9th place and is 190 m high.

We are happy to have been involved in the planning of these exceptional buildings. Congratulations to the design teams led by Zaha Hadid Arch. and BIG for these awards.

15 October 2020

Idea Conference 2020

Due to Corona, this year's "Idea Conference - From Ideas to Realization" will also take place in digital format only.

Adam Orlinski, B+G Vienna, will give his lecture from 11:15 - 12:00:
"Parametric Engineering - Strategies for Combining Algorithmic Modelling and Structural Design".

08 October 2020

2020 ConstruirAcier Trophées Eiffel: Awarded

The Lycée Léonard de Vinci in Saint-Germain-en-Laye, France, has won the 2020 ConstruirAcier Trophée Eiffel. Congratulations to TANK Architectes and COSA - Colboc Sachet architectures!

Bollinger+Grohmann was responsible for the structural design.

© TANK et COSA, architectes associés, Photo : Camille Gharbi

September 2020

First game at Allegiant Stadium in Las Vegas

Las Vegas Raiders hosted their first game at Allegiant Stadium in Las Vegas. The opening match in the newly built 1.8bn mega stadium took place on September 21st.

Bollinger+Grohmann provided the design of the cable roof structure and did the studies for the complex Biglift-installation and prestressing procedure of the cable roof. We were present on-site from the very beginning until the last cable was pinned.

01 October 2020

Construction progress in Luxemburg

The construction work on the new European Commission building complex in Luxembourg is progressing. The construction of the new building complex includes two construction phases. First, the 180-meter-long 7-storey main building will be built. In the second phase, the 90-meter high office tower is to be built. Both buildings should be completed by the beginning of 2024. The Bâtiment Jean Monnet II was designed by KSP - Jürgen Engel Architekten. Bollinger+Grohmann are responsible for structural and façade engineering.

22 September 2020

Kneipp Erlebnispark - Olsberg bridge

The 34-metre long bridge at the western turning point of the Kneipp Active Circuit in Olsberg was lifted in September and is now close to completion.

Bollinger+Grohmann are responsible for object planning and structural engineering.

24 September 2020

Topping out ceremony: Training Center Bonn

After a construction period of only 10 months, the topping-out ceremony for the new medical training center was celebrated at the Bonn University Clinic.
After completion, the four-story reinforced concrete building will provide space for over 600 trainees.

B+G was responsible for the structural engineering.

23 September 2020

"2 of 5": The International Highrise Award 2020

B+G was responsible for the structural concept of two finalists 2020: "Leeza Soho" in Peking and "Omniturm" in Frankfurt - where we were also in charge of the façade design (concept- and schematic design, design development). Congratulations to our clients Soho and Tishman Speyer and the design teams led by Zaha Hadid Arch. and BIG.

The International Highrise Award has been awarded by the city of Frankfurt am Main since 2003.

20 September 2020, from 4 p.m.

Next Expertenforum: Die adaptive Gebäudehülle

Together with the DBZ as a media partner, NEXT Partner invites all interested and curious parties to the virtual NEXT expert forum on 22 September 2020.

4:30 p.m.:
"Fluid Flow Glazing: eine Glasfassade für die Zukunft?", lecture of Daniel Pfanner, partner/management, Bollinger+Grohmann

22 September 2020

Autodesk BIM Modeling Guideline

The new and first edition of the German AUTODESK BIM MODELING GUIDELINE was released yesterday. It contains a lot of useful tips provided by the main author Markus Hiermer and expert insights by our friends and project partners HL-Technik, Kohlbecker, VRAME and many others. Our colleagues Florian Gschwind and Alexander Hofbeck from B+G Munich and Frankfurt were also involved and contributed with their knowledge and project experience, such as how to set-up a BIM-Workflow in a collaborative environment with Architects and MEP-Planners or how to create proper BIM-Models.

16 September 2020

Out now: Ingenieurbaukunst - Engineering made in Germany

The book presents 20 outstanding buildings out of five volumes of the book "Ingenieurbaukunst", published by the Federal Chamber of Engineers.

We are very happy to be part of this volume featuring two of our projects, the Louvre in Lens and the new ECB premises, which even made it onto the cover.

05 September - 22 November 2020

"urbainable - stadthaltig"

Positions on the European City for the 21st Century
Exhibition by the Akademie der Künste.

34 members of the Architecture Section present a broad spectrum of ideas for the city of the future along with the pressing issues of our time, such as digitalisation, mobility, cultural techniques of density, handling with nature, building in existing structures or technical innovations.

Duration of the exhibition: 5.9. - 22.11.2020
Location: Academy of Arts, Hanseatenweg 10, 10557 Berlin

Picture © Erik-Jan Ouwerkerk. Graphic: Heimann + Schwantes

05 September 2020, 4 pm

The Watson's Hotel (2019, India, 82 min.)

The film by Ragunath Vasudevan, Nathanie Knop and Peter Rippel will be shown in full length on the opening weekend to complement the exhibition contribution of Klaus Bollinger and Ragunath Vasudevan.

25 August 2020

Interchange Pavillon, South Eveleigh, Sydney

The newly opened Interchange Pavilion located in the Australian Technology Park consists of 15 tonnes of robotically moulded glass-reinforced concrete, 1400 pieces of router cut hardwood and 250 metres of stainless steel ground rails. The unique material palette is supported by a 14-tonne structure made up of 1650 digitally fabricated aluminium pieces to form a 350 m² public art installation. Bollinger+Grohmann was responsible for structural engineering.
Photo: Studio Chris Fox
Isomoetry: Bollinger+Grohmann

May 2020

B+G in Düsseldorf

Since the end of May we are now also represented in the Rhineland with our new branch in Düsseldorf.
The address is:
B+G Bollinger and Grohmann GmbH
Zollhof 6 / Grand Bateau
40221 Düsseldorf
Due to current situation, the planned opening ceremony of the office has unfortunately been delayed until after Corona.
If you are in the region, you are welcome to drop by for a visit.
We are looking forward to new exciting projects!

26 June 2020

Won: Extension Sportforum Hohenschönhausen, Berlin

B+G won the competition for the extension of the top sports training centre for winter sports called Sportforum in the general planning team with Nieto Sobejano Arquitectos, Berlin and Madrid.
The new building will be directly connected to the existing speed skating hall and will provide spaces for further training facilities for the athletic training of the ice sportsmen as well as a functional area with offices, sanitary facilities, changing rooms and lounges.
Visualisation: Nieto Sobejano

18 June 2020

Opening of the Deichman Library in Oslo

After the delay caused by Corona, the opening of the new Deichman Library will finally take place on the 18th of June. The official opening ceremony can be followed live on Facebook at 5:00 pm.
B+G was responsible for the structural and façade design of this exciting project.
Photo: Einar Aslaksen

16 July 2020

åpning av klimahuset

Klimahuset i Oslo, som er tegnet av Lund Hagem og Atelier Oslo, ble åpnet av kronprinsen 16.06.2020. Vi deltok i prosjektering av konstruksjon og bærekraft fra konkurranse til og med forprosjekt samt prosjekteringsgruppeledelse i skisse- og forprosjekt. Vi gratulerer alle involverte med et fint og bærekraftig bygg.

11 June 2020

Vi vant! Nytt utkikkspunkt til Sivlefossen i Nærøydalen, Voss

Østengen & Bergo har sammen med Bollinger+Grohmann vunnet arkitektkonkurransen om det nye spektakulære utkikkspunktet til Sivlefossen. Vi ble invitert som et av tre kontorer i konkurransen om nytt utkikkspunkt til Sivlefossen i Nærøydalen, Voss.
Rendering: Østengen & Bergo

9 June 2020

Konkurranse "Opptre" i Oslo: 1. premie

Sammen med Mopo arkitekter og Tømrermester Torstein Newth vant vi innovasjonskonkurransen «Opptre». Prosjektet vårt som var et 50-talls Husbanken typehus ble premiert for både arkitektur, energiforbruket (83% reduksjon) og nZEB-balansen.

27 May 2020

Winning competition - Arena Porte de la Chapelle

We are happy to announce that we won the competition of "Arena" for the Olympics and Paralympics 2024 in Paris together with Ville de Paris and Bouygues Bâtiment Île-de-France and the architect offices SCAU and NP2F.
The 8000-seat venue and the two superimposed timber gymnasiums will host the Badminton and Taekwondo competitions. Afterwards, Basketball games and music shows will be hosted in the arena.
Bollinger+Grohmann supported the team with structural and façade engineering.
Image credit: ArtefactoryLab

14 May 2020

Quartiersporthaus Wilhelmsburg, Hamburg: 1st prize for ROBERTNEUN

Congratulations to the architects from ROBERTNEUN on winning 1st prize in the urban planning and building construction competition for the
"Quartiersporthaus Wilhelmsburg" in Hamburg.
The "Quartierssporthaus" forms the centre of the newly developing Elbe island quarter located in Hamburg Wilhelmsburg. In future, the new building will be the sporting home of the Bundesliga basketball club Hamburg Towers. In addition, a triple sports hall, a sports hostel, a hotel and an office building are planned.
B+G consulted the competition team in terms of structural engineering.
Visualisation: ROBERTNEUN

May 2020

"Bleiben und Begegnen unter einem Dach"

As Deutsche Bauzeitschrift magazine partner, Agnes Weilandt comments on spectacular structures, digital planning processes and the limits of feasibility in the current issue about roof structures and in the DBZ podcast.
There is also a report on the roof construction of the Frans Masreel Centre in Kasterlee, Belgium. B+G was responsible for the structural engineering.

20 March 2020

WINNING COMPETITION - Didier Vaillant sports complex, Villiers-le-Bel, France

We are very happy to announce that we won the design competition for the construction of the project Didier Vaillant sports complex with architects bureau faceB and Ylé Architectes.
The sports equipment project engages in current problems by structural optimization to reduce useful material with timber lattice beams, the choice of local materials and low carbon emissions.
Bollinger+Grohmann supported the team with a structural engineering consultancy.
Image credit : Edouard Maréchal - Paris Picture Club

13 March 2020

WINNING COMPETITION - Gymnasium and multi-purpose hall, Presles-en-Brie, France

We are very happy to announce that we won the design competition together with the architects Lemoal Lemoal for the construction of a gymnasium and a multi-purpose hall, held by the city of the Presles-en-Brie. This project proposes material optimization, the choice of local materials and low carbon emissions with the use of timber lattice beams. Bollinger+Grohmann supported the team with structural and façade engineering consultancy.
Image credit: Jeudi Wang

February 2020

Article by Stefan Polóny: DBZ 02/2020

Reading tip by Stefan Polóny in the DBZ (Deutsche Bauzeitschrift) issue 02/2020.
Foto: Benedikt Kraft / DBZ

13 January 2020

WON: Competition for the new office tower in Düsseldorf at Kennedydamm 55

Congratulations to kadawittfeldarchitektur, who has won the competition for the new office tower in Düsseldorf at Kennedydamm 55.
The twisted tower will contain approx. 26000m² and reach a height of 120m.
The client is AENGEVELT Immobilien from Düsseldorf. We supported the team with structural and façade engineering consultancy.

December 2019

3 x CTBUH Award of Excellence Winner 2020

The Omniturm was the only European high-rise building to receive the Award of Excellence in the category "Best Tall Building 100 - 199 meters", alongside five other high-rise buildings from Asia, Australia and North America.
The Leeza SOHO Tower was also awarded in the category "Best Tall Building 200-299 meters".
The LAKTHA CENTER is listed in the category "Best Tall Building 400 meters and above".
We are delighted to have been part of the planning of these extraordinary buildings and congratulate all those who were involved in its construction.

1 January 2020

Bollinger+Grohmann is growing

As of January 1st, 2020, Bollinger+Grohmann will also be represented in Budapest and Brussels.
Managing director and administrator in Budapest is Csaba Böhm.
Address: Bollinger + Grohmann Engineers Kft.,
Kossuth Lajos utca 4. 3rd floor 3B,
1053 Budapest, Hungary.
Managing director and administrators are Wim Jansen, Kenny Verbeek and Klaas de Rycke.
Address:
Bollinger Grohmann S.r.l.,
Boulevard de l'Empereur 24,
1000 Bruxelles, Belgium.