© Gehbauer Helten Architekten

Factory Poly-Clip

en | de | fr | hu
City, Country Hattersheim, Germany
Year 2009–2011
Client Frank Niedecker
Architect Gehbauer Helten Architekten
Services Structural Engineering
Facts GFA: 20,400 m² | Gross volume: 159,650 m³

The company “Poly-clip Systems” has received a new factory in Hattersheim. A big sawtooth roof hall for the machine production is located in the centre of the building. Furthermore there are two-storey side wings who house the administration, a customer centre as well as the construction and the development.

Besides the filigree construction of the prefabricated elements the building is characterized by the bright production hall with a lot of daylight, whose sawtooth roof was realized as a slim steel construction.

Hall & Roof
Industrial