project description
The merge of media such as radio, television and the internet into cross-media has fundamentally changed many technical areas, production processes and workplace requirements. This has a decisive influence on the use of modern media houses. The WDR movie house was built in 1974 and given this background undergoes extensive reconstruction and will be thoroughly refurbished.
structure
The film house consists of nine upper floors and four basement floors and was built as a solid reinforced concrete construction. The ceilings were constructed as continuous joist and flat ceilings. These rest on reinforced concrete walls and columns, most of which are fixed to the foundations. Along with the outer shell, prefabricated load-bearing columns are placed at regular intervals, on which the joist slabs are supported.
In order to make the use more open and transparent, existing walls and ceilings are demolished and replaced by new staircases and column joist systems.
façade
The load-bearing façade construction including the anchoring elements will be completely renewed. On the ground floor, the façade is to be constructed as a mullion and transom façade and partially extends to the 1st basement floor. The remaining façade will be constructed as a double façade with prefabricated concrete balconies, with an integrated baffle and sliding doors behind it as a thermal façade.
Data
Client:
WDR
Architect:
Buchner Bründler Architekten
Competition: 1st prize (2015)
Start of planning: 2015
Start of construction: 2017
GFA: 24,000 m² | Gross volume: approx. 94,000 m³
Service:Structural engineering, Façade engineering
Related Links
more projects referring to:
> Façade

13 February 2023
Symposium: urban future forum
The event deals with the topic "Das Material der Stadt – Baustoff als Ressource" (The city's material - building material as a resource).Agnes Weilandt is one of the speakers in the third event of the urban future forum symposium series "Für eine nachhaltige Architektur der Stadt", German only.
Venue: DAM's interim premises in Frankfurt, Ostend, Germany,
Time: 6-9 pm

23. November 2022
Altes Polizeipräsidium on TV
In the context of the revitalisation of the Old Police Headquarters (built 1912-1914), the structural safety assessment of the historic ceilings will be done via experimental loading tests due to the lack of existing as-built drawings.On 22.11.2022, the German regional television channel Hessische Rundfunk was on site with a film team to follow one of the loading tests.

11 November 2022
"Building outside the Box“: 2nd prize for Niklas Haschke
Congratulations to our colleague Niklas Haschke whose “Structural Web Tool” ranked 2nd in the Innovation award hosted by the Bayerische Ingenieurekammer-Bau.Niklas has developed an intuitive and user-friendly planning tool that can significantly improve efficiency and resource conservation based on data-driven decisions. Also on the team of applicants were Alexander Hofbeck (B+G) and Ljuba Tascheva (B+G).

October 2022
UP!Berlin: Transformation einer Großstruktur aus Stahlbeton
In his article, Christoph Gengnagel (B+G Berlin) is writing in about the transformation of the former East Berlin department store into a modern office building.The report was published in August in Beton- und Stahlbetonbau and is available now as a download (in German).

October 2022
Distinction: Arbeitgeber der Zukunft
We are happy to receive the "Arbeitgeber der Zukunft" (Employer of the Future) award from the German Innovation Institute for Sustainability and Digitalization (DIND). DIND assesses companies for their innovative capacity, the status of digital transformation, employee friendliness, modern leadership, and recruiting strategies. E.g., flat hierarchies, flexible compensation models and employee benefits are included in building a holistic picture which was created using an evaluation matrix and developed with experts from business and science.
16 September 2022
Exhibition: NOW, NEAR, NEXT,
The digital exhibition NOW, NEAR, NEXT, documents in an exciting way current projects and working methods of the NAX partners and focuses on the transformation of architecture and construction. The consistent German values such as perfectionism, quality in construction and project management, reliable engineering services and on-time delivery are enhanced by the experimental, the courageous, the different, the creative, the unfinished and perhaps also the typically "un-German". Research and development play just as big a role as new materials and (digital) processes.
12 September 2022
Groundbreaking ceremony: GIZ Campus
This week, the foundation stone was laid for the future GIZ Campus in Eschborn, Germany. The new six-storey building is being constructed on a total area of 53,000 m², of which 21,000 m² is underground and 32,000 m² above ground. Completion is scheduled for 2025.Planning and realization is carried out by the Viennese architectural office Caramel, we are responsible for the structural engineering.
Visualisation ©Caramel

9 September 2022
Assembly of ‘Bog Crane’
The second high voltage pylon, ‘Bog Crane’, by PART Architecture, follows the same principles and visual identity as its older sibling, ‘Bog Fox’.The new mast consists of one prominent member and three other support legs pinned down onto four isolated foundations.
The pylon was designed with the characteristics of the environment in mind and will become a part of the Estonian electricity infrastructure.
Photo: Jaan Tiigi

1 September 2022
Bollinger+Grohmann in Hamburg
We are now also represented in Northern Germany with our new branch in Hamburg. Our office is located close to the Elbphilharmonie.The address is:
B+G Ingenieure Bollinger und Grohmann GmbH
Am Sandtorkai 40
20457 Hamburg

26 August 2022
Estrel Tower: Construction Site Update
The Estrel Tower is located at the edge of Berlin’s suburb Neukölln. Last week, the construction site was busy, and they finished the work on completing the floor slab.The 177 m tall tower will become the new landmark and the city’s tallest high-rise. The Estrel Tower is scheduled to open at the end of 2024 and will offer a mix of hotel, serviced flats, offices, gastronomy and event spaces.
It is designed by Barkow Leibinger, and Bollinger+Grohmann is in charge of structural and façade engineering and building physics.

26 August 2022
Laying of the foundation stone: Guest House University of Hamburg
The University of Hamburg is building a new guest house in the Rotherbaum district. The ground floor of the eight-storey building will house the lobby and a seminar room. Flats and standard rooms are planned for the upper floors.The foundation stone for the University of Hamburg's new guest house has been laid, and completion is planned for 2024.
Bollinger+Grohmann is responsible for structural and façade engineering.
Visualisation ©bloomimage_Buchner-Bründler

24th August 2022
Competition won!
150 years after the initial competition for the historic Stuivenberg Hospital, the winning team of this year's competition for the site's redevelopment has been revealed, and we are part of it.We will work closely with Architectenbureau Sabine Okkerse, BOOM Landscape, Bovenbouw Architectuur and Korteknie Stuhlmacher Architecten to give this unique round hospital pavilion architecture, designed by architect François Baeckelmans, a new vision for the future of the city.
Photo credits : ©Bovenbouw - Korteknie Stuhlmacher

01 August 2022
Topping-out ceremony: Waiblingen Süd
The celebration of completing the structural work for the four-group daycare centre, residential floors and sports hall took place this week in Wablingen South, Germany. The building complex is a hybrid construction out of timber and reinforced concrete. B+G was responsible for structural engineering and building physics.
02 August 2022
Won! "Aus der Tiefe in die Höhe - Grubenwasserhebewerk"
In May, we supported the architectural office Mecke Palme in the invited façade design competition for the newly planned mine water hoist in Bergkamen, Germany.We are happy to announce that our entry is the winner, not least because the design results from a unique creative exchange and collaborative design process between the architects and our office.
Visualisation: Mecke Palme

28 July 2022
Opening: Bavarian Landespolizei in Passau
The police HQ house five offices and around 430 employees, designed by wulf architekten. In addition to service and meeting rooms, the 6-storey building also provides the necessary space for police operational training, areas for a firing range, a workshop, an underground car park for the service vehicles, a canteen and a staff parking deck.Bollinger+Grohmann was in charge of structural engineering.

17 June 2022
VIDEO: FOUR FRANKFURT
In the middle of Frankfurt am Main, four unique high-rise buildings are currently being built on the former Deutsche Bank site. With their forward-looking architecture and sustainable urban development concept, they will bring together living, housing, and working in the centre of the banking district.Bollinger+Grohmann is - together with our Arge partner Werner Sobek - responsible for the structural engineering of the FOUR project on behalf of Groß & Partner.
The film looks behind the scenes and shows how we, as a team, master a significant project of this kind.

03 June 2022
Opening of Heidi Horten Collection
We are thrilled to announce that the new private museum for the Heidi Horten Collection opened today in Vienna after almost two years of construction work!The refurbished building consists of a new underground level and four above-ground floors: an administrative level and three exhibition levels connected by free-floating staircases. The three upper levels are supported by four main supports at the ends of the existing central walls, the façade level and the firewall to the neighbouring building. The façade was preserved in its original state, apart from the incision for the new entrance area.

23 May 2022
Pavilion of Greater Paris Metropolis
As part of its participation in BAP2022, the Greater Paris Metropolis is proposing an exceptional architectural work, unveiling a pavilion that constitutes the first experience of a building based on the principle of a biodiverse wall.Designed as part of a research project conducted by the ChartierDalix agency over several years, this structure is a massive load-bearing wall and a vertical floor inhabited by flora and fauna.
Photo by ©Camille Gharbi

May 2022
Competition ENERGYHUB: 2nd prize
Congratulations to raumwerk Architekten for winning 2nd prize in the competition EnergyHub, energy centre and transformer station at Deutzer Hafen in Cologne, Germany. The building ensemble provides a transformer station, energy centre and parking facility that captivates with its uniform appearance and, at the same time, refers to the tradition of brick expressionism of the 1920s and thus to the traces of this location.Bollinger+Grohmann gave expert advice in structural engineering.
Visualisation ©raumwerk

28 April 2022
polis Award for MORINGA
MORINGA in Hamburg's HafenCity won the polis Award 2022. It won gold as the best project development in the category Ecological Reality.With MORINGA, Germany's first residential high-rise is being built in the Elbbrückenquartier in line with the cradle-to-cradle principle, directly on the water.
Image ©rendertaxi/Moringa GmbH by Landmarken

April 28th 2022
protoCampo, our new adventure with Wald.City
ProtoCampo is now starting to be installed in the garden of Académie de France à Rome - Villa Médicis following a year of co-design and construction with 44 professional students.The Villa Médicis is located on the Pincio hill next to the famous Spanish Steps, in the heart of Rome. It will welcome, within its 8-hectare garden, this new 300 sqm timber pavilion.
protoCAMPO is an open architecture fully dismountable composed of an agora made of 17mx17m locally sourced timber and sustainable material, supplemented by a 6m height inflatable dome called the cupola.
Bollinger+Grohmann works together with the architects Wald.City and brings its expertise in structural engineering.
Photos : ©jeudi.wang

28 April 2022
Topping Out: KiTa Anwandeweg
The topping-out ceremony for the Anwandeweg daycare centre in Aschaffenburg, Germany, took place today.The two-storey building with 6 group rooms, an open refectory with a gallery and an administration area is L-shaped around a playground. The new building is a timber frame construction on a flat bedded floor slab. The arcade is presented as a steel construction.
Bollinger+Grohmann is responsible for structural engineering, fire protection and building physics.

7 April 2022
Competition "Ettinghausenplatz": 1st prize
We are happy about the first prize in the Ettinghausenplatz competition in Frankfurt-Höchst, Germany, won by the architects Meixner Schlüter Wendt together with KuBuS Freiraumplanung and Bollinger+Grohmann.The multi-layered design recreates the cubature of the synagogue, which was destroyed by the National Socialists in 1938, using a greened trellis and makes it possible to experience the unique history of the square.
Image: Meixner Schlüter Wendt

April 2022
Completed: Immerge
Studio Chris Fox's latest artwork is called "Immerge" and was recently completed. The interpretation of the original water tank is located next to the Tramsheds in Forest Lodge, Sydney. "Immerge" resurrects a piece of history by using reused panels. Each panel weighs over 250 kg.Bollinger+Grohmann was responsible for the structural engineering and specifications of the treatment and protection of the cast-iron panels.
Image: ©Studio Chris Fox

05 April 2022
Construction site: CARL
Germany's tallest residential building to date is being built in a timber hybrid construction in Pforzheim. The residential tower will be constructed predominantly in timber with a reinforcing core as a steel structure. The core concreting work following the sliding method was realised within 11 days, and completion is scheduled for next Saturday.The tower will be located at the edge of the Arlinger district, including a daycare centre and gastronomy in two five-storied neighbouring buildings in solid construction based on mutual underground parking.
The design is by Peter W. Schmidt Architekt BDA, and Bollinger+Grohmann joined the project team for structural engineering in the Design Development phase and is responsible throughout Construction Document Phase.

29 March 2022
DBZ: DESIGNING MORE SUSTAINABLY
The upcoming DBZ issue features an article by our colleagues Daniel Dieren, Diego Apellaniz and Christoph Gengnagel on digital life cycle analysis as an essential tool to optimise the life cycle assessment of projects in the early design phases. Using the example of the projects "UP!" (Jasper Architekten, Gewers Pudewill) and "VOLTARIUM" (hillig architekten, realace), they describe initial experiences, state of the art and its development potential.
March 2022
Belsenpark II in Düsseldorf: 1st prize
Together with the city of Düsseldorf, the Cologne-based project developer PANDION held an international competition for the high-rise building in Belsenpark II. We are pleased to announce that the design by UNStudio was chosen as the winner by the jury. The design includes a mixed-use high-rise with residential and office use and two other residential buildings.Bollinger+Grohmann supported the team in terms of structural and façade engineering.
Image: UNStudio & Flying Architecture

March 2022
Ostrava Tower
Ostrava Tower will become the tallest skyscraper in the Czech Republic measuring 235 metres designed by CHYBIK + KRISTOF and Anarchitekt, Jiří Soukup. Bollinger+Grohmann supported the design team during the study phase in terms of planning services for structural engineering, consultancy for façade engineering and building physics and we reviewed fire engineering and MEP/Building Services.The design features an X-shaped structure and geometry that is concave in cross-section, it shifts on its axis and expands outwards. With its 56-storeys and 98,000 m², it will offer wide views over the city.
Image ©Chybik + Kristof Architects & Urban Designers

21.02.2022
ArchDaily : The 15 Winners of the 2022 Building of the Year Awards
ArchDaily has revealed the 15 winners of the 2022 Building of the Year Awards.Into this selective list, the Villa M, located in Paris, has been awarded in the Healthcare Architecture category.
The building was completed in 2021 and aims to create a new pact between City, Nature and Health.
The program implemented into a dynamic Parisian area welcomes on the façade of this low-tech architecture, a vertical medicinal forest, fulfilled inside with a wide range of services such as hotel, restaurant, bar, conference area, check-up area.
This oasis was designed by Triptyque Architecture and enhanced on the artistic direction side by the famous designer Phillipe Starck.
BollingerGrohmann Paris has worked on façade engineering.

16 February 2022
DFG Symposium: Vision and Strategies for Reinforcing Additively Manufactured Concrete Structures
The recording of the Deutsche Forschungsgemeinschaft (DFG) Symposium held in November 2021 is now online!In the presentation "Optimizing Reinforcement: Structural Analysis, Challenges and Strategies", our colleague from Bollinger+Grohmann Vienna Adam Orlinski introduces us to the possibilities of 3D-concrete-printing with parametric modelling and the potential within this combination. The presentation was developed together with Klaas De Rycke and Moritz Heimrath as part of the symposium series "Vision and Strategies for Reinforcing Additively Manufactured Concrete Structures".

31 January 2022
FROM COOPERATION TO INTEGRATION
Bollinger+Grohmann (B+G) and the engineering office Ingenieurbüro Greiner / IngenieuRinG (IB Greiner) join their forces.Expertise, creativity and continuity as well as a lot of pleasure in project work are elementary components of our success. On this basis, B+G and IB Greiner have decided to integrate IB Greiner and its holdings into Bollinger+Grohmann Holding AG as of 1 January 2022 as part of a succession plan.
IB Greiner will operate as B+G Greiner GmbH in the future. The branches in Budapest and Omsk will continue to operate as IngenieuRinG Mérnökiroda Kft. and OOO GF Consulting.

January 2022
1st prize for Sohnstraße 45 in Düsseldorf
Congratulations to HPP Architekten and the whole planning team on winning the first prize. Bollinger+Grohmann Düsseldorf supported the team in terms of structural engineering.The competition entry stands for a sustainable, resilient, mixed-use neighbourhood that allows for functions such as office, residential, commercial, cultural, daycare and care.

18 November 2021, 7 pm
Book talk: INLEGNO. Cambiare prospettiva per costruire il futuro
The volume is the result of the research carried out by close cooperation between the architects from Park Associati and Bollinger+Grohmann on the wide potential of wood as a sustainable resource in present and future architecture.Join tomorrow's book talk in the course of the Bookcity Milano 2021 at 7 pm at Park Hub via Garofalo 31 or join digitally. See link below.
The book will be released on 24 November 2021.

12 November 2021
Won: Structural Awards 2021
We are thrilled to announce that the domes of Taiyuan Botanical Garden were selected winner of the Structural Awards 2021 in the category ‘Structural Artistry’!The three timber gridshells are made out of overlapping beams braced with post-tensioned cables. Bollinger+Grohmann was responsible for the development of the structural concept design.
Kudos to our colleagues at StructureCraft for the further development and fantastic realisation of the structure and thanks to Delugan Meissl Associated Architects and the rest of the planning team for the outstanding cooperation.
Photo: CreatAR

11 November 2021
Digitaltour: ESO-Supernova
Alexander Hofbeck (B+G Munich) and Moritz Heimrath (B+G Vienna) will hold an online lecture on ESO Supernova. The observatory in the north of Munich was designed by Bernhardt+Partner Architekten and realised in close collaboration with Bollinger+Grohmann across three branches. The structural engineering and its parametric workflow will be the focus of this presentation from the beginning of the project until the end.The lecture will take place on the 11th of November at 6 pm
In order to join this event, register through the link below.
Photos: ©ESO

October 29th, 2021
Radio Television Suisse : On a site of excellence
The construction of the new production centre of Radio Télévision Suisse (RTS) in Lausanne is underway. It is located in a prestigious economic area.The future headquarters is a set of four rectangular concrete buildings that are called the emergences, connected by a "bridge building" called the Champ, for which B+G is in charge of the structural engineering.
The complex is a feat of engineering because the Champ is a mixed steel-concrete structure with a very long range, suspended with a distance of more than 60m between the emergences and a 15m cantilever, all floating 8m above the ground.
The future RTS production site will open its doors in 2025.
©Air Production Suisse Romande

26 October 2021, 7 pm
On the Duty and the Power of Architecture
Klaus Bollinger and the Berlin architect Volker Staab take part next Tuesday in the Architecture Section’s lecture series called “On the Duty and the Power of Architecture". Akademie der Künste members present their current projects and talk about the responsibility and influence of building culture.
22 October 2021
Munch Museum in Oslo opens its doors
The new Munch Museum opened its doors last Friday in Oslo.The 26,300 m² curved building has been realized by estudio Herreros architects. The museum gathers the largest worldwide collection of the Norwegian painter Edvard Munch, whose collection has been bequeathed when he died in 1944.
After the Deichman Library, this is the second project in the neighbourhood of the Opera House in the harbour of Oslo. This time, B+G Oslo was responsible for façade engineering.
Photo: Adrià Goula

October 15th, 2021
Laying of the foundation stone: ARENA JO 2024 Porte de la Chapelle
Tuesday 05th October, the foundation stone of the ARENA Porte de la Chapelle project in Paris, was laid in the presence of the Mayor, Anne Hidalgo, and the head of the 2024 Olympic and Paralympic Games organising committee, Tony Estanguet. The structure will house the badminton and rhythmic gymnastics events of the 2024 Olympic Games. This hall will be able to welcome 7,000 spectators.Our team is responsible for both the structural and façade design. The structure in the gymnasium area is a combination of concrete and wood elements. The base consists of a steel curtain wall façade and wooden cladding.
The Arena is scheduled to open in 2023.

October 22nd, 2021
David Telerman - Objects Of Intention - McNeal020 - Arizona
Atelier David Telerman with Objects Of Intention have realised McNeal 020 in the desert valley of Cochise County (Arizona) as an inverted pyramid set into the earth, with stairs leading to an underground square space in the form of a "reinforced concrete box".The lid of the box is connected to the surrounding landscape by four walkways of different lengths.
The ground plan of the pyramid is approximately 15 x 15 m and 3 m deep. The entire structure was made of in-situ concrete and stands on a strip foundation.
B+G (Paris) was responsible for the structural engineering.
©David Telerman
You can find out more about the project during the Grand Prix AFEX 2021 exhibition, which will be held at the Palais Royal in Paris until January 02nd 2022 :

21 October 2021
Estrel Tower: start of construction in Berlin
Located at the edge of Berlin’s suburb Neukölln the 175 m tall Estrel Tower will become the new landmark and the tallest high-rise of the city.Completion is scheduled for 2024.
The design comes from the internationally award-winning architectural firm Barkow Leibinger and Bollinger+Grohmann Berlin is in charge of structural and façade engineering as well as building physics.
Picture Credit ©Barkow Leibinger

September 2021
Hotelimmobilie des Jahres 2021: Ruby Luna
Hotel Ruby Luna in Düsseldorf is "Hotelimmobilie des Jahres 2021". The Hotel project results from a revitalisation of the former Commerzbank high-rise in Kasernenstraße in Düsseldorf designed by Paul Schneider-Esleben in 1962. It is one of the most important office high-rise buildings of early German post-war modernism.Bollinger+Grohmann was responsible for the structural and façade engineering.

October 18, 2021
NYON – Gradient - Passerelle
Start of Construction in NyonAfter winning the launched competition for two 300-metre-long pedestrian bridges in Nyon together with Exploration architecture, the construction work for the bridge Nyon-Prangins has started.
The project is part of an environmental and social concept and thus serves to reduce mobility-related C02 emissions. The bridge is scheduled for completion in 2023.
©Explorations architecture, Bollinger+Grohmann, Marti-Baron et Xavier Veilhan, perspecteur « Luxigon »

12 October 2021
Parametric Engineering - From material performance to form optimization
Sascha Bohnenberger, Managing Director of Bollinger+Grohmann Melbourne, speaks on the occasion of the lecture series on advanced technologies and optimisation in architecture and design.Date: 12 October 2021
Time: 5:00 pm Sydney Time / 8:00 am CET
Join via Zoom for free below

October 12th, 2021
Bruther / Arc en rêve
From Thursday, October 14th at 6.30 p.m, we will have the pleasure of discovering and rediscovering the fabulous work of the agency Bruther whose exhibition "Engine, action, form" traces the work of Stephanie Bru and Alexandre Thériot. It takes place in Bordeaux at arc en rêve center of architecture until February 20th, 2022.Bollinger+Grohmann is collaborating with Bruther on the Frame project - media house - in Brussels and brings its expertise regarding the structural design.
Photo credit : Artefactorylab and Maxime Delvaux

1 October 2021
wienwood21 Prize: Ilse Wallentin Haus
This years wienwood prize was given to four outstanding timber buildings in Vienna and among the winners is the seminar centre Ilse Wallentin Haus at the University of Natural Resources and Life Sciences (BOKU)! 78% of the four floored building is made out of wood, resulting in low CO2 emissions during the construction and operation.Bollinger+Grohmann supported with structural engineering.
Photo: Hertha Hurnaus

September 28, 2021
B+G in the rankings of "Séquence Bois" for low-carbon construction
This year, in addition to the ranking of architectural firms, the French magazine Séquences Bois also honours specialist planners who invest in low-carbon construction, especially with regard to the implementation of construction methods using materials such as wood, stone, clay, hemp, straw or recycled materials.Bollinger+Grohmann is ranked 20th in the list of planning firms active in the field of low-carbon construction. In another list of the most productive planning offices in low-carbon construction, B+G ranks 8th!

September 21, 2021
Nominated for the Brussels Architecture Prize 2021
For its first edition, the Brussels Architecture Prize jury nominated the TONDO footbridge into the "small intervention" category. It's for both its functional and structural qualities, as well as its shape this project was selected.
September 16, 2021
Wald City at Artocène
During the contemporary art festival "Artocène 2021" in Chamonix-Mont-Blanc, the office Wald.City installed its flexible housing unit "Proto-Habitat" at the city limits. The project combines low-carbon construction with sustainable living and consists of a wooden structure built on site that can be easily assembled, disassembled and extended. The basic module is 45 square metres and can accommodate one to three people and can be extended to a space of up to 120 square metres.B+G provided technical support for the project in terms of construction.

7 September 2021
“Årets Bygg 2020”: Deichman Bjørvika
The five-storey Deichman Bjørvika library at Oslo’s waterfront was awarded “Årets Bygg 2020” (Building of the Year). Key factors in the jury's final decision were beside the outstanding architectural solutions by the architects from Atelier Oslo and Lundhagem as well as the sustainable production which reduced the CO2 emissions during construction by 40%.Bollinger+Grohmann Oslo was responsible for the structural and façade engineering.
Photo: Photo: Einar Aslaksen / Pudder Agency

6 September 2021
Lecture: Building in the system in existing and new buildings - as a concept for sustainability
Christoph Gengnagel, B+G Berlin gives a lecture as part of the online seminar of the "Bildungstage 2021 im IKzB" at the Information and Competence Centre for Future-Oriented Building (IKzB).6 September 2021, 10.15 a.m., registration via the link below.

23 - 27 August 2021
IASS Annual Symposium and Spatial Structures Conference 2020/21
This year, the 7th International Conference on Spatial Structures will take place from 23 - 27 August as a joint virtual event with the IASS annual symposium.Manfred Grohmann is chairing Wednesday's Morning session S35 "Hangai Prize Applicants 1" at 9.00-10.15 am (UK time).
Sessions 48 and 58 "The future of structural design - symbiosis in architecture and structural engineering 1+2", by chairmen Klaas de Rycke (Bollinger+Grohmann Paris) and Lars De Laet (University of Brussels) take place on two consecutive days. On Wednesday, 25 August, Afternoon sessions-2, 16.45-18.00 pm (UK time) and on Thursday, 26 August, Morning sessions-2, 10.30.-11.45 am (UK time).
Bollinger+Grohmann is supporting the conference as an Event Partner.

19 August 2021
The Public Library of the Year award: Deichman Library
The Deichman Library in Oslo has been named the world’s best new public library. The Public Library of the Year award is presented annually by the International Federation of Library Associations and Institutions (IFLA) in collaboration with the Danish software company Systematic A/S.Bollinger+Grohmann Oslo was responsible for structural and façade engineering.
Photo: Photo: Einar Aslaksen / Pudder Agency

août 2021
NAX report 2021: International timber construction
The second NAX report 2021 focuses on international timber construction.As NAX sponsor, Bollinger+Grohmann was asked to report on its many years of experience in international timber construction projects.

July 2021
Research project: MY-CO SPACE pavilion
The MY-CO SPACE pavilion was designed through a collaborative research project between the Technische Universität Berlin (Prof. Dr. Vera Meyer), Universität der Künste Berlin (WM Christian Schmidts) and Hochschule Bochum - Bochum University of Applied Sciences (Prof. Sven Pfeiffer) with structural support from Bollinger+Grohmann, has been completed and is part of the current exhibition “TinyBe - Living in a Sculpture” in the Metzlerpark in Frankfurt.The exhibition runs until 26 September 2021.
Photo © Prof. Sven Pfeiffer

July 2021
1st prize: Neubau Stadtbahnbetriebshof Weilimdorf
Congratulations to Auer Weber for the first prize in the competition. Bollinger+Grohamn Stuttgart supported the architects in terms of structural engineering.The depot marks an important entrance to the city. In future, the project unites all the necessary buildings and areas under one landscape roof. Its concise form is developed from the functional framework conditions and its location in the landscape space. The light rail depot is scheduled to be completed in 2026.
©Auer Weber / Sabine Heine Illustration

June 2021
2nd prize: Federal Environment Agency
Congratulations on the 2nd price for the refurbishment and replacement of a laboratory and administration building for the Federal Environment Agency (UBA) in Berlin.The Munich team of Bollinger+Grohmann supported the architects for this very innovative and sustainable competition with a structural concept of a hybrid concrete-timber using cross-laminated and composite timber-concrete slabs.
Visualisation ©Nickl & Partner

1 June 2021
'Fluid Bodies'
3 years ago, Bollinger+Grohmann joined the artistic research project ‘Fluid Bodies’ under the direction of Klaus Bollinger at the University of Applied Arts Vienna. The research project aimed to challenge the conventional formwork concepts about concrete and the pre-existing assumptions about the material and its abilities. Models and objects in various sizes where produced with a series of methods spanning over many disciplines such as architecture, fashion design, structural design and sculpture.To celebrate the end of the project, the research team opens the doors to the public for a one-day exhibition at the Wotruba-Atelier in Vienna where they completed their last workshop.
1 June 2021, 16:00
Rustenschacherallee 2-4
1020 Vienna

21 May 2021
First Prize: Reinventing Cities Milan
We are happy about the first place in the competition MoLeCoLa promoted by Comune di Milano and C40 Cities, Reinventing Cities.This impressive result was possible thanks to the multidisciplinarity and integrated design and the collaborative work between all team members under the leadership of Park Associati and Hines Italy: Habitech - Distretto Tecnologico Trentino, ESA | engineering, consultancy & sustainability, BollingerGrohmann, MIC - Mobility In Chain, Baggio Marilena Greencure, Irs - Istituto per la Ricerca Sociale, Schneider Electric, A2A CALORE & SERVIZI S.R.L., Wood Beton S.p.a., Ammlex - Amministrativisti Associati.
Photo: Park Associati

April 2021
ERFURT - BUGA 2021
The Bundesgartenschau in Erfurt has opened end of April and the panorama lift with the 27m long, very light and narrow connecting walkways is in operation. The walkways connect the free-standing elevator tower with the mighty bastion wall. On the city side, the small platform at the elevator tower offers a great view towards the cathedral square and the historic centre.Architecture: Schulitz Architects
Structural Engineering: Bollinger+Grohmann
Photo: Schulitz Architects

April 2021
SOMNIUM featured in "Stahlbau"
As part of the extension of the Johannes Kepler Universität in Linz, we were in charge of the structural engineering of the SOMNIUM, a free-form platform on the highest building on the campus. The viewing terrace, which is spatially framed by a trellis for future vegetation, serves as a remote oasis of relaxation for campus visitors.Now the project is featured in the April issue of "Stahlbau" by Ernst und Sohn, Berlin. The authors are Thomas Schaumberger and Arne Hofmann from Bollinger+Grohmann Vienna.

27 April 2021
Competitionline Ranking 2020
The competitionline-Ranking is the only architects' ranking in the German-speaking world that is based exclusively on competition results. Once a year, the competitionline editorial team evaluates all the competition results published on competitionline.com and creates the ranking of the most successful offices from them.We are very pleased about the good rankings of our office in the following categories:
3rd place in the category STRUCTURAL ENGINEERS
6th place in the category CIVIL ENGINEERS
3rd place in the category BUILDING PHYSICS

April 2021
2nd place in competition: NICE HQ, Oderzo
"Nice Headquarter" is designed as a high-tech building. The key characteristics are the transparency and lightness of the façades and the roof, which is a monolithic element that opens and closes according to the sun position and weather conditions. It provides a dynamic and flexible space for the inner courtyard.A set of integrated lights enhances the building's perception at night, maintaining a high level of visibility and a sober profile blending with the surrounding environment.
Bollinger+Grohmann was responsible for structural and façade engineering.
©Photo: Park Associati and Bollinger+Grohmann

12. April 2021
Stefan Polónyi (1930–2021)
We received the sad news that Stefan Polónyi has passed away on April 9.Stefan Polónyi was a leading builder, master teacher, inventor, pioneer and role model. His exemplary contribution in science, teaching and practice strengthened the self-image of engineers and consistently enhanced constructive interaction between architects and engineers. We will miss him. Our thoughts are with his family.
Photo: Benedikt Kraft

1 April 2021
Green & Blue Building Award
The Ilse Wallentin-Haus is the recent timber construction at the University of Natural Resources and Life Sciences, Vienna (BOKU). The project received the Green & Blue Building-Award in the category “Project” for the focus on sustainability during the development as well as for the use of recyclable & renewable materials.Client: BIG Bundesimmobiliengesellschaft m.b.H.
Architect: SWAP Architekten, Delta Projektconsult
Structural Engineer: Bollinger+Grohmann
Congratulations to the entire project team!

30 March 2021
International Competition in Sicily: Finalist
Our project was one of the 5 finalists in the International Competition for the new Administrative Centre of the Sicilian Region. It was great to participate in such a challenging and innovative project! Congratulations to the whole team:Studio Transit, Studio Valle Progettazioni, Studio Faraone, Studio Cangemi, United Consulting, Bollinger+Grohmann, Gae Engineering, Studio A&P architettura del paesaggio with Eleonora Tomassini, Vamirgeoind, Fabio Roncato
Image: HERE S.r.l. with ENGRAM

March 2021
Riedbergallee Student Residence: Process
The timber structure of the 5-story student residence (timber and concrete hybrid) is rising in high speed. The prefabricated CLT wall and slab elements, which span up to approx. 8 m, arrive with all necessary openings and milled slots for the service pipes and are mounted next to the buildings concrete cores and compartment walls. Together with Ferdinand Heide Architects from Frankfurt we started planning in early 2018 and were responsible for the structural engineering (LP1 to LP6) and building physics (LP1 to LP7).Photo: Kai Laumann

February 2021
AIT Award Finalist 2020
The AIT awards are one of the largest competitions for architecture and interior design in the world. The Frankfurt Pavilion by schneider+schumacher and Bollinger+Grohmann was among the finalists in the category Retail/Fair.The iconic building was constructed for the first time at the Frankfurt Book Fair in 2018 and returned again as the venue for events with authors and industry experts from all over the world in 2019. The space-defining structure was generated and optimized by the team, taking into account architectural, structural and static criteria using genetic algorithms.

15 February 2021
"WOOD. Change the present. Build the future."
After one year of research on timber structures, Bollinger+Grohmann and Park Associati are working on a publication to collect all the information. How did we get the results of our research on wood? We combined our expertise through the applied exercise of re-engineering.
February 2021
Fritz-Kissel-Siedlung, Frankfurt: Process
The speedy construction process in Frankfurt's Fritz-Kissel-Siedlung is impressive. After the building permit was granted in September 2020, the first tenants moved into the apartments in mid-December.Since several construction steps happen at the same time, you can follow every timber module addition phase on the construction site.
Bollinger+Grohmann was already in charge of the feasibility study for fire protection and the structural design for the extension in 2017. We are now responsible for the entire fire protection concept and the structural engineering for the existing structures.

January 2021
Second Annual USGlass Design Awards: Recognition for MoMA NY
We are happy to share that our project "Extension of The Museum of Modern Art", has been recognized in the Second Annual USGlass Design Awards, winning in the low- to mid-rise construction category.As part of the façade team with FRENER & REIFER , Bollinger+Grohmann were responsible for the structural analysis, building physics proofs, design-assist, construction document phase, workshop and assembly planning of the façade.

January 2021
Digital Media House of the "Rundfunk Berlin-Brandenburg"
After Baumschlager Eberle Architekten won the Berlin-Brandenburg Broadcasting rbb "Digital Media House and Campus Development" project in summer 2020, Bollinger+Grohmann were chosen as planners for structural engineering, façade engineering and building physics.The new building will combine cross-media working and production processes, moreover intensify the cooperation of radio, online and television.
Visualization: rbb/Baumschlager Eberle Architekten

21 January 2021
Architizer A+Firm Awards 2021: Distinction
The A+Firm Awards spotlight engineers and professionals from the AEC sector.We are very pleased that Bollinger+Grohmann has been selected as one of the five Finalists in the Best Engineering Firm category!

December 2020
FOUR Frankfurt: Construction progress
After the start of the special foundation civil engineering in 2019, FOUR, our large-scale construction site has reached the foundation pit in partial cover construction. The reinforcement of the first-floor slab section has been laid and from now on it will go up parallel to the basement levels with the high-rise buildings.Together with our ARGE partner Werner Sobek Frankfurt, we congratulate all those involved in the project on reaching this milestone.

15 January 2021
Opening Tondo in Brussels
On Thursday 14 January 2021, the footbridge Tondo officially opened in Brussels.Designed by Office KGDVS, the "spatial element" connects the House of Representatives’ offices with its recent extensions, the new Forum Building, on the other side of the Leuvensestraat. It can be described as a stiff disc, the roof, on which the floor hangs with a minimal presence of structure.
Bollinger+Grohmann has been responsible for the structural engineering.

14 January 2021
B+G Brussels has just moved!
New year, new office, same nice team now in Rue de la Loi, Wetstraat 26, 1040 Brussels.We look forward to meeting you there very soon!

14 January 2021, 4 pm - 5 pm
BAU Online 2021: Book presentation "Nachhaltigkeit, Ressourceneffizienz und Klimaschutz“
In March, the new handbook "Sustainability, Resource Efficiency and Climate Protection" is going to be published by Ernst & Sohn. The aim is to summarise the current state of the art for civil engineers and the construction industry with constructive solutions for planning and building and to provide assistance and orientation.
December 2020
"Architektur fertigen. Konstruktiver Holzelementbau."
The new Triest Verlag publication has been available in bookshops for two weeks. The book focuses on design and planning strategies with regard to their professional practice.In her contribution about "Digital Design - Hacking the digital chain", our colleague Agnes Weilandt introduces the method of parametric design and uses several project examples to show how the design can emerge in a system of synchronous design, technical feasibility and production.

October 2020
Deichman Library wins Norwegian concrete award
The Norwegian award "Betongtavlen" is given to buildings in which concrete is used in an ecologically, aesthetically and technically outstanding way.The library was designed by the architects Lund Hagem Arkitekter and AtelierOslo. Bollinger+Grohmann is responsible for structural engineering.
©Picture Einar Aslaksen / Pudder Agency

10 November 2020
Emporis Skyscraper Award
This is the twentieth time that the Emporis High-Rise Award. The 164 m high Leeza SOHO Tower in Beijing takes 2nd place and Frankfurt's Omniturm is in 9th place and is 190 m high.We are happy to have been involved in the planning of these exceptional buildings. Congratulations to the design teams led by Zaha Hadid Arch. and BIG for these awards.

08 October 2020
2020 ConstruirAcier Trophées Eiffel: Awarded
The Lycée Léonard de Vinci in Saint-Germain-en-Laye, France, has won the 2020 ConstruirAcier Trophée Eiffel. Congratulations to TANK Architectes and COSA - Colboc Sachet architectures!Bollinger+Grohmann was responsible for the structural design.
© TANK et COSA, architectes associés, Photo : Camille Gharbi

September 2020
First game at Allegiant Stadium in Las Vegas
Las Vegas Raiders hosted their first game at Allegiant Stadium in Las Vegas. The opening match in the newly built 1.8bn mega stadium took place on September 21st.Bollinger+Grohmann provided the design of the cable roof structure and did the studies for the complex Biglift-installation and prestressing procedure of the cable roof. We were present on-site from the very beginning until the last cable was pinned.

16 September 2020
Out now: Ingenieurbaukunst - Engineering made in Germany
The book presents 20 outstanding buildings out of five volumes of the book "Ingenieurbaukunst", published by the Federal Chamber of Engineers.We are very happy to be part of this volume featuring two of our projects, the Louvre in Lens and the new ECB premises, which even made it onto the cover.