© Maxime Delvaux

iMAL, Center for Digital Cultures and Technology

en | fr | nl
City, Country Brussels, Belgium
Year 2016–2020
Client IMAL
Architect NP2F, Central architects
Services Structural Engineering
Facts Surface area: 1,500 m²

iMAL currently occupies the second floor of a typical industrial building from the early 20th century. The rehabilitation project consists of opening the ground floor of the building to the street while doubling its ceiling height by nearly 7 meters.

This new art, science, technology and innovation centre will accommodate Fablab, two exhibition spaces, workshops, offices and an archive room.

The existing building consists of plates supported by a column-beam structure. A part of the reinforced concrete slab is demolished at the entrance to place a large "aviary". It is composed of autonomous metal structures that define a clear and differentiated space from the general construction of the building. Taking advantage of the structure's height at the entrance, a mezzanine is placed, housing the workshop area. It is supported by a primary structure composed of glued laminated beams. The structure is based on existing reinforced concrete walls and beams. The floor is made of a CLT wooden slab.

Structural Engineering
Building Retrofit
Cultural
Planning
© B+G
Construction
© B+G
Completion
© Maxime Delvaux