| City, Country | Bielefeld, Germany | |
| Year | 2021–2026 | |
| Client | Universität Bielefeld | |
| Architect | Telluride Architektur | |
| Services | Structural Engineering Building Physics Fire Engineering |
|
| Facts | GFA: 12,080 m² | |
A new research facility has been built on the Bielefeld University campus, alongside several other new institute buildings. Spread across four floors, it houses laboratories, demonstration rooms, offices, and seminar and meeting rooms. The building features a full basement and includes an entrance area, a cafeteria with an adjoining kitchen, technical areas, and lounges for university use. A green roof with a terrace is located on the fourth floor.
The new building is designed as a reinforced concrete skeleton structure, with 35 cm thick flat slabs serving as the floor system. In the entrance area and along the northern façade of the ground floor, the perimeter columns are offset inwards. Reinforced concrete beams and localised slab thickening are used to transfer the loads from the upper floors. Due to the highly inhomogeneous subsoil, the building has deep foundations consisting of bored piles.
B+G's services include structural engineering, fire engineering, and building physics (thermal and acoustic insulation), covering service phases 1 (basic evaluation) to 6 (preparation of tender documents).