Stream

en | de | hu
City, Country Berlin, Germany
Year 2017–2021
Client SIGNA
Architect Gewers Pudewill
Services Façade Engineering
Facts GFA: 51,000 m² | Surface area Façade: 18,000 m²

The office high-rise STREAM is located between Berlin Ostbahnhof and Warschauer Straße, directly at the Mercedes-Benz Arena.

The individual floors fold upwards in ceilings and exterior walls without breaks or leaps and play in the levels with only two alternating floor plan solutions. The result is an attractive tower figure, which appears varied and diversified. The façades are mostly glazed and offer spectacular views over Berlin.

Bollinger+Grohmann was responsible for the façade engineering.

As part of the schematic design, the planning team defined the design and technical requirements for the façade. The façade of the building is divided into three sections: the façade of the entrance area, of the upper floors (1st-23rd floor) and the technical façade (24th floor).

In addition to the design ideas of the architects, the boundary conditions from building physics, static and design requirements, safety requirements, and manufacturing and assembly processes must be taken into account.